24/09/2026
❄️ Efficient snowmaking starts long before the first cold night.
When the first suitable snowmaking window opens, every hour can count. That is why pumps, pipelines, filters, hydrants, sensors and snowmaking machines should already be checked and ready for operation.
Water reservoirs also deserve attention: algae, sludge and other deposits should be removed in good time to help ensure a reliable water supply and continuous operation when temperatures finally drop.
In our latest blog article, we take a closer look at why successful snow production begins months before winter – and which checks and preparations can make the difference once the first cold window arrives.
👉 Read the full article on our blog: https://slope-experts.com/en/blog/preparing-snowmaking-efficient-snow-production-starts-before-the-first-cold-day
Fotocredits: TechnoAlpin