08/12/2024
**Samzol Powertech Completes Critical Air Conditioning Upgrade for MV ###**
*Pulau Duyong, 8th December 2024* β The Samzol Powertech team, led by Iwan, Adat, and Arif, successfully completed an essential air conditioning upgrade onboard MV ### at Pulau Duyong.
The task involved replacing the starboard side ceiling cassette air conditioning unit with a new 3HP model, ensuring optimal cooling performance on the vesselβs bridge. Additionally, a contactor was installed at the outdoor unit to enhance the system's reliability.
This technical effort reflects Samzol Powertech's commitment to delivering high-quality service and maintaining the operational efficiency of marine systems. The job is reported as complete, pending the final signing of the report by the client.
Stay tuned for more updates on our projects and initiatives in marine engineering excellence!