Samzol Powertech Aircond Kemaman

Samzol Powertech Aircond Kemaman Menyediakan servis dan pakar dalam bidang Airconditioning. Troubleshoot,repair,servis dan new installation.

Specialist in marine aircond,chiller,freezer
+ Fabrication
+Electrical

04/01/2026

🌟 Nikmati Keselesaan Maksimum Bersama Pakar Aircond Anda! 🌟

Pastikan rumah dan pejabat anda sentiasa sejuk, selesa & berfungsi optimum bersama Samzol Powertech.

âś… Perkhidmatan Kami:
• Pemasangan Aircond (Residential & Commercial)
• Servis & Penyelenggaraan Berkala
• Pemeriksaan & Penyelesaian Masalah Aircond

🏠 Kenapa Pilih Samzol Powertech?
âś” Tenaga kerja profesional & berpengalaman
âś” Harga berpatutan, telus & tiada caj tersembunyi
âś” Kerja kemas dengan jaminan kualiti

📞 Hubungi Kami Sekarang!
📱 Faizal: +6011-6108 1882

Jangan tunggu sehingga aircond rosak sepenuhnya.
Hubungi kami hari ini untuk keselesaan berpanjangan!

Samzol Powertech
Your Comfort is Our Guarantee

**Samzol Powertech Completes Critical Air Conditioning Upgrade for MV ###**  *Pulau Duyong, 8th December 2024* – The Sam...
08/12/2024

**Samzol Powertech Completes Critical Air Conditioning Upgrade for MV ###**

*Pulau Duyong, 8th December 2024* – The Samzol Powertech team, led by Iwan, Adat, and Arif, successfully completed an essential air conditioning upgrade onboard MV ### at Pulau Duyong.

The task involved replacing the starboard side ceiling cassette air conditioning unit with a new 3HP model, ensuring optimal cooling performance on the vessel’s bridge. Additionally, a contactor was installed at the outdoor unit to enhance the system's reliability.

This technical effort reflects Samzol Powertech's commitment to delivering high-quality service and maintaining the operational efficiency of marine systems. The job is reported as complete, pending the final signing of the report by the client.

Stay tuned for more updates on our projects and initiatives in marine engineering excellence!

Successful Completion of Re**er System Oil Separator Installation Onboard M.V. SSSLocation: Kemaman AnchorageSamzol Powe...
26/11/2024

Successful Completion of Re**er System Oil Separator Installation Onboard M.V. SSS

Location: Kemaman Anchorage

Samzol Powertech is proud to announce the successful completion of a critical project onboard the M.V. SSS. The project involved the replacement of two re**er system oil separators (Ref. No. 1 and No. 2) as part of a comprehensive maintenance initiative to enhance the vessel's refrigeration system efficiency.

Our experienced team was tasked with delivering a complete solution, including manpower, tools, equipment, and transportation, ensuring seamless ex*****on. The scope of work included:

Safely releasing refrigerant from the system.
Flushing the system thoroughly with nitrogen to remove impurities.
Installing brand-new oil separators with precise brazing for leak-proof integration.
Replacing the oil compressors with SL68
Installing new filter driers to improve system filtration.
Conducting a pressure test and leak check to ensure optimal system integrity.
Vacuuming the system and refilling it with refrigerant gas.
Completing the project with a comprehensive test run and commissioning to verify performance.
Despite the challenges of working onboard a vessel at anchorage, our team demonstrated exceptional coordination and professionalism. The project was completed on schedule and to the client’s satisfaction, ensuring the re**er system is now operating at peak performance.

Samzol Powertech continues to uphold its commitment to delivering reliable and efficient engineering solutions, meeting the highest industry standards. This project further solidifies our reputation as a trusted partner in the maritime sector.

We thank our team and the M.V. SSS crew for their cooperation and support in achieving another milestone success.

25/11/2024

On 17th November 2024, the Samzol Powertech team, led by Sani Kadir, successfully completed the servicing and commissioning of the Perkin Generator K1C at ### in Gebeng. The team worked closely with the As Power team to carry out a thorough servicing of the generator, ensuring it was fully operational and running at peak efficiency.

Following the servicing, the generator underwent a rigorous testing and commissioning process, ensuring that all systems were functioning as expected. The job was completed on schedule, marking another successful project for Samzol Powertech. This accomplishment highlights our commitment to delivering top-tier service and maintaining the highest standards for our clients

Samzol Powertech Tackles Critical System Repair at KemamanOn November 25, 2024, Samzol Powertech, under the guidance of ...
25/11/2024

Samzol Powertech Tackles Critical System Repair at Kemaman

On November 25, 2024, Samzol Powertech, under the guidance of Sani Kadir, successfully completed a crucial maintenance task for customer MV ### at Kemaman. The job focused on the Oil Water Separator (OWS) system, which had been facing operational issues.

Samzol Powertech’s team swiftly identified and resolved the fault with the OWS, ensuring smooth operation. Additionally, the team addressed a common wiring failure in the system, restoring full functionality. The job was completed with great efficiency, and the system is now back to optimal performance, ensuring minimal downtime for the client.

This achievement highlights Samzol Powertech's commitment to providing high-quality, reliable solutions to its clients, ensuring their systems remain in top working condition. The project is marked as successfully completed, demonstrating Samzol Powertech's expertise and dedication to excellence.

Stay tuned for more updates on our ongoing projects!

25/11/2024

Successful Electrical Wiring Installation at ### for Pokya

On November 25, 2024, Samzol Powertech team—comprising Iwan, Arif, and Adaq—completed a challenging yet successful electrical wiring project at ### for our esteemed customer, Pokya. The job involved intricate electrical installations, including working at height using a 3-tier staging to ensure a safe and efficient setup.

Key Job Details:

Socket Installation: 2 sets of 13A double sockets
Lighting Points: 4 standard lighting points with a looping point connected to a CW photocell system
Switches: 2 switches for controlling lamps, including 1 with a photo cell for automatic lighting control
Additionally, Pokya supplied the lamps and sockets for the installation, and Samzol Powertech team ensured the setup was executed to meet the customer’s exact requirements.

The project was completed on schedule, with all systems tested and fully operational.

We are pleased to announce the successful completion of this job, now officially done. Our thanks to Pokya for their collaboration, and we look forward to future projects together

**Samzol Powertech Enhances A-Frame Design for AS Power’s Heavy Lifting Operations**Samzol Powertech is proud to announc...
20/11/2024

**Samzol Powertech Enhances A-Frame Design for AS Power’s Heavy Lifting Operations**

Samzol Powertech is proud to announce the successful modification of an A-frame for our valued client, AS Power. As the fabricator of this specialized equipment, we’ve worked closely with AS Power to improve its design, ensuring increased stability and flexibility for heavy lifting tasks.

The updated A-frame now features a reduced height for easier handling, while structural integrity has been reinforced with additional bracing and support plates. These enhancements prevent tipping and minimize lateral movement, ensuring the frame can safely support heavy loads during operations.

A key upgrade includes the installation of an adjustable bar system at the top of the A-frame. This system allows for the quick and secure installation and removal of 6-inch pipes, significantly improving operational efficiency.

Before the A-frame is put into use, rigorous safety checks and load-bearing tests will be conducted to guarantee its reliability. This modification demonstrates Samzol Powertech’s commitment to delivering high-quality, durable solutions tailored to meet the specific needs of AS Power.

Stay tuned for more updates on this collaboration as we continue to provide innovative, custom-designed solutions for our clients!

**Location:** Anchorage KSB  **Date:** 19/11/2024  Our team, led by Khairul, Andak, and Arif, successfully completed mai...
20/11/2024

**Location:** Anchorage KSB
**Date:** 19/11/2024

Our team, led by Khairul, Andak, and Arif, successfully completed maintenance work on the main air conditioning system No. 2. The task involved replacing the leaking suction copper pipe and conducting a pressure test using nitrogen to ensure the system's optimal functionality.

**Materials Supplied:**
- 1 unit of copper elbow (2 1/8")
- 10-inch copper pipe (2 1/8")

Our team continues to ensure high-quality service, keeping systems running efficiently and effectively for our valued clients. Thank you for trusting Samzol Powertech with your energy needs!

**Samzol Powertech Resolves Bow Thruster Issue for MV XYZ**On November 7th, 2024, the Samzol Powertech service team, led...
09/11/2024

**Samzol Powertech Resolves Bow Thruster Issue for MV XYZ**

On November 7th, 2024, the Samzol Powertech service team, led by Sani Kadir, responded to a critical issue aboard the MV XYZ vessel, located at SGK. The vessel was experiencing a malfunction with its bow thruster, a vital system for maneuvering, which had been rendered inoperable due to a common fault in the frequency inverter control box.

Upon arrival, the Samzol Powertech technicians quickly began troubleshooting the problem. The team focused on the frequency inverter control box, which was determined to be the cause of the issue. With careful attention, they proceeded to recheck the soft starter controller equipment to ensure that all related components were functioning as expected.

After addressing the fault, the team carried out a series of tests and commissioning procedures to ensure that the bow thruster was fully operational. Thanks to their thorough work and expertise, the bow thruster was restored to optimal performance.

By the end of the day, the job was successfully completed, and the bow thruster was found to be in excellent working condition, ready to support the vessel’s operations once again.

This prompt and efficient service highlights Samzol Powertech commitment to resolving technical challenges and ensuring the continuous performance of critical equipment for our customers.

Address

Lot 61480 Perkedaian Taman Seroja
Kemaman
24000

Alerts

Be the first to know and let us send you an email when Samzol Powertech Aircond Kemaman posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Samzol Powertech Aircond Kemaman:

Share