C&C Construction And Realty Sdn Bhd

C&C Construction And Realty Sdn Bhd Reliable contractor for building works and infrastructure works.

Nearly completed semi detached house!
04/01/2023

Nearly completed semi detached house!

Lightweight roof truss can be easily fabricated in all shapes and sizes. And also more versatile and cost effective opti...
12/08/2022

Lightweight roof truss can be easily fabricated in all shapes and sizes. And also more versatile and cost effective option.

Skim coat plastering used to decorate and increase the durability  of a wall, different types of skim coat are mostly de...
03/07/2022

Skim coat plastering used to decorate and increase the durability of a wall, different types of skim coat are mostly depending on the thickness and the roughness of the walls.

28/06/2022

知道全满浆和半满浆的差别吗?know the difference of the fullness and unfullness of the mortar joint and improving the bond strength?

Roofing work means the hoisting, storage, application, including related verge tile and ridge tiles installation for the...
08/05/2022

Roofing work means the hoisting, storage, application, including related verge tile and ridge tiles installation for the purpose of providing weather proof protection.

20/01/2022

Can still see gunny bags curing nowadays?

17/01/2022

Construction of formwork, placing reinforcement bars of the floor and the final step is to pour, compact and finish concrete!

10/12/2021

Ground beams are horizontal structural elements of the building which transfer the loads imposed on them.

Lightweight GI steel roof truss, which is durable, high strength to weight ratio, pest resistance and environmental frie...
22/09/2021

Lightweight GI steel roof truss, which is durable, high strength to weight ratio, pest resistance and environmental friendly system

All walls need a base coat before finish coat plaster can be applied directly to these surfaces as they will generally b...
31/08/2021

All walls need a base coat before finish coat plaster can be applied directly to these surfaces as they will generally be flat enough and not too porous.😊

1.all drawings will be studied and understood before work commence.2.lines and levels to be set out by competent person ...
19/06/2021

1.all drawings will be studied and understood before work commence.
2.lines and levels to be set out by competent person and continually checked during works.
3.mortar will be used in accordance with the design specification.
4.brick, wall ties, damp proof sheet, cavity details will be in accordance with architectural and engineers drawings.

Address

Mersing
86800

Telephone

+60166132093

Website

Alerts

Be the first to know and let us send you an email when C&C Construction And Realty Sdn Bhd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to C&C Construction And Realty Sdn Bhd:

Share