AcmeBliss Company

AcmeBliss Company Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from AcmeBliss Company, Contractor, Opopogbooro Ado Ekiti, Ado Ekiti.

2024
14/01/2026

2024

07/01/2026

117 Followers, 90 Following, 40 Likes - Watch awesome short videos created by AFRITAGE

4 Bedroom
07/01/2026

4 Bedroom

3 Bedroom bungalow
07/01/2026

3 Bedroom bungalow

27/12/2025
Construction? We get you covered.
17/08/2025

Construction? We get you covered.

ESTIMATE OF MATERIALS ON 2_BEDROOM BUNGALOWHere we estimated the quantity of materials and labor, you add prices accordi...
03/08/2025

ESTIMATE OF MATERIALS ON 2_BEDROOM BUNGALOW

Here we estimated the quantity of materials and labor, you add prices according to your location and current market price.

Pls note: there may be variation of materials required depending on the sizes of rooms/space, type of soil you're building on, location and source of materials. This is t0 Guide you in your Building project Plan:

βœ”οΈFOUNDATION WORK:

1. Digging (20 partitions)
2. Concrete Blinding (6bags)
3. Mason for Concrete Blinding (2 masons)

4. Laying of Blocks@Foundation level(480 blocks)
5. Plinth Beams Formwork (15 partitions)

6. Casting of Concrete for Plinth Beams (5 bags)

7. Mason to Dress Plinths beams (N20k-N25k)

8. Filling of the Foundation(N80k -N150k)

9. Oversite Concrete (37 bags)

10. Masons to Dress Oversite Concrete (2 masons):

●Subtotal for Foundation Work:πŸ–•πŸ‘†

βœ”οΈSUPERSTRUCTURE:

1. Laying of Blocks@Main building(1,400 blocks)

2. Lintel Formwork (27 partitions)

3. Concrete Casting for Lintel (12 bags)
4. Mason to Dress Lintel
5. Blocks Laying for Leveling (3 masons+Servers):
6. Parapet Formwork
7. Parapet Concrete Casting
8. Mason to Dress Parapet:
9. Roof Carpenter:

Subtotal for Superstructure:

βœ”οΈMATERIALS REQUIRED:
1. Blocks (2,400 blocks)
2. Cement (112 bags)
3. Purlins (170 units)
4. 2x4 Rafters (1,200 units)
5. Aluminium (80 square meters): no price tag here.
6. Sand (8 tippers)
7. Gravel (4 tippers)
8. Pegs (2 units)
9. Mason Rope (3 units)
10. Laterate (4 tippers)
11. Rod Y12mm (8 units)

Subtotal for Materials: = --add them upπŸ‘†--

βœ”οΈWATER SUPPLY (Borehole or Water Tank)
1. Borehole (optional): N700,000 - N2,500,000
or
2. Water Tank (10,000 liters): N170,000 - N250,000

βœ”οΈTotal Estimated Cost(Foundation Work)+(Superstructure) + (Materials) +(Borehole) or (Water Tank) = ----(with borehole) or =-----(with water tank)

The total estimated cost for constructing a 2-bedroom bungalow, including water supply, is approximately =----- (with borehole) or =------- (with water tank).

Avoid parapet to curtail cost

Handle the foundation stage differently to maximize cost too, many spend so much here,some foundation can work very well without some structural expensesπŸ‘Œ

Avoid forms and sharps that demand a lot to achieve

Avoid some roofing sheet and if possible go for flat roof

2_bedroom,Bathroom, kitchen and open Lounge.
Note: This is not comprehensive but it will guide you,if you don’t have any knowledge of building. Also no price Tags ,you can confirm prices from your location

π‘³π’Šπ’Œπ’† , 𝑺𝒉𝒂𝒓𝒆, π‘ͺπ’π’Žπ’Žπ’†π’π’• ,& π‘­π’π’π’π’π’˜ πŸ‘‰ for more updates on anything Building...

Shalom πŸ‘ πŸ™ŒπŸ™πŸ’

With Brain Jotter – I'm on a streak! I've been a top fan for 10 months in a row. πŸŽ‰
02/08/2025

With Brain Jotter – I'm on a streak! I've been a top fan for 10 months in a row. πŸŽ‰

02/08/2025

Celebrating my 4th year on Facebook. Thank you for your continuing support. I could never have made it without you. πŸ™πŸ€—πŸŽ‰

Address

Opopogbooro Ado Ekiti
Ado Ekiti
11001

Telephone

+2348028515538

Website

Alerts

Be the first to know and let us send you an email when AcmeBliss Company posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to AcmeBliss Company:

Share

Category