That viral comparison is technically flawed and misleading . It compares two completely different engineering realities ...
17/10/2026

That viral comparison is technically flawed and misleading . It compares two completely different engineering realities :

LET US ENLIGHTEN YOU WITH FACTS , NOT EMOTION . I LEFT OPPOSITION TO SUPPORT AND DEFEND RESULT . Lagos - Calabar coastal wonder in Nigeria.

1 . The Egypt Road is NOT Same Scope :

That 10,228km Trans-African road they quote is mostly rehabilitation and grading of existing desert alignment — flat , dry , hard laterite desert soil , minimal bridges , 2-lane single carriageway, asphalt of 50-75mm .

Our Lagos-Calabar is a GREENFIELD 10-LANE superhighway — building from ZERO inside Atlantic Ocean surge , swamp , mangroves .

2 . Terrain Factor — The Biggest Cost Driver :

Egypt-South : Sahara Desert = natural sub-base , zero water table , zero settlement.
Lagos-Calabar : 750km of coastal swamp, peat clay, high water table, ocean waves . As a Civil Engineer you must know what that means PBAT is doing :
5-8 meters dewatering
Geotextile + stone columns
Concrete pavement , not asphalt — 280mm reinforced concrete designed for 50 years, not 10 years.
- Shoreline protection — rock revetment, sea wall .

Desert road = cut and fill. Coastal road = marine engineering .

3. Pavement Type :

- $1.6B road = flexible asphalt .
- Lagos-Calabar = Rigid concrete pavement (Nigeria's first along the axis ) — import of rebar, higher cement content , 4x lifespan . That alone doubles cost but saves future generations .

4. Structures & Bridges :

Egypt route has less than 50 minor bridges.

Lagos-Calabar has over 70 bridges , interchanges, 200+ culverts, toll plazas, service stations — each interchange alone is $20-30M in swamp.

5. Cost Per Km Reality Check :

$1.6B / 10,228km = $156k per km. Even a rural laterite road in Nigeria today rates $500k/km . That Egypt figure is either 1980s cost , donor-subsidized, or just grading — it cannot be a full modern highway at 2025 prices. A proper 2-lane highway in Africa is $1M-$1.5M/km.

Lagos-Calabar at $12B for 700km = ∼$17M/km — for a 10-lane concrete coastal expressway with sea defense, it is within world coastal highway benchmark . Coastal highway in USA (California) is $25-40M/km . Dubai's Jumeirah coastal road was $20M/km.

6. Economics — Naira Devaluation :

That #15 Trillion is over 8 years construction + inflation + FX at #1,500/$. If you price it in 2015 Naira, it would be #1.8 Trillion. We must not use nominal Naira to scare people.

My Conclusion as Engr with 4 decades experience :

1. Don't compare a desert footpath with an ocean concrete superhighway . One is laying carpet on dry floor, the other is building a house inside water.

Lagos-Calabar is expensive because it is difficult , first-of-its-kind , and built to last 50-100 years . Our children will thank us for the concrete, not asphalt that washes away every rainy season .

We can question transparency constructively — yes, demand BOQ — but let us not destroy a legacy infrastructure with false comparison .

Balogun Engr Michael Olusegun Feyisola
Convener @
@ O'CLOCK ⏰️ 2027

Thanksgiving Sunday .
04/10/2026

Thanksgiving Sunday .

04/08/2026
Detail of  a footing
29/07/2026

Detail of a footing

How to Square a Corner Using the 3-4-5 RuleThe 3-4-5 rule is a simple and reliable method used in construction to create...
29/07/2026

How to Square a Corner Using the 3-4-5 Rule

The 3-4-5 rule is a simple and reliable method used in construction to create a perfect 90° corner. It is based on the Pythagorean theorem (3² + 4² = 5²) and is widely used for building layouts, foundations, walls, and formwork.

Steps

1. Mark the starting point where the two sides will meet.

2. Measure 3 m along the first side and place a stake.

3. Measure 4 m along the second side and place another stake.

4. Measure the diagonal distance between the two marks.

5. Adjust the layout until the diagonal measures exactly 5 m.

6. Once the diagonal is correct, the corner is a perfect 90° angle.

Advantages

Ensures accurate right-angle layouts.

Prevents alignment errors in foundations and walls.

Quick, simple, and cost-effective.

Suitable for residential and commercial construction.

Common Mistakes

Measuring from incorrect reference points.

Using stretched or damaged measuring tapes.

Not securing stakes firmly.

Ignoring uneven ground conditions.

Failing to recheck all measurements before excavation.

26/07/2026

Types of Building Foundations

Building foundations transfer structural loads safely into the ground. Spread footings support light to medium loads, pile foundations carry heavy loads to deep, strong soil, raft (mat) foundations distribute loads over weak soils, and caisson (drilled shaft) foundations are used for heavy structures such as bridges and high-rise buildings.

Related Hashtag :

26/07/2026

Building Load Transfer Path

A building transfers loads safely from the roof slab → beams → columns → foundation (pile cap/footing) → soil. Each structural element carries and distributes the load, ensuring the building remains stable, safe, and capable of supporting all dead, live, and environmental loads.

Related Hashtag :

@ Consultants, Project Managers . Design and  Construction.  Buildings and Bridges....etc.
26/07/2026

@ Consultants, Project Managers . Design and Construction. Buildings and Bridges....etc.

Address

Plot 1&2 Engr Segun Feyisola Avenue, Off Iraye Road (Beside INEC OFFICE) , Epe.
Lagos

Alerts

Be the first to know and let us send you an email when Dodowdawa Integrated Services LTD. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share