Erosion & Sediment Control Services

Erosion & Sediment Control Services Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Erosion & Sediment Control Services, Clevedon.

Erosion & Sediment Control Services provide professional Erosion Control Services, including the installation of silt fences and SRP pond fit-outs

Servicing AKL, WKO, BOP
Est 2014

LESSONS FROM THE FIELD | JUNE 2026 - link is in our bio.One of the most common issues we see on earthworks projects isn'...
05/06/2026

LESSONS FROM THE FIELD | JUNE 2026 - link is in our bio.

One of the most common issues we see on earthworks projects isn't poor installation – it's selecting the wrong sediment control for the site conditions.

Sometimes we see silt fences installed where runoff can never reach them.

Other times we see standard silt fences expected to manage catchments that really require diversion bunds, clean water cut-off drains, or sediment retention ponds.

We also regularly see Super Silt Fence specified where a standard silt fence would achieve the same outcome at a lower cost.

The lesson?

✅ More control isn't always better.

✅ Less control isn't always enough.

✅ The right control, in the right place, for the right reason.

Since 2014, ESCS has been working alongside contractors, developers, engineers and environmental teams across New Zealand. Through *Lessons From The Field*, we're sharing practical observations from real projects to help improve compliance, reduce risk, and keep sediment on site.

What are some common sediment control issues you've seen on site?

🚫 When Convenience Costs Compliance🚫This silt fence was cut open to let a mower through… and now it’s doing absolutely n...
01/05/2026

🚫 When Convenience Costs Compliance🚫

This silt fence was cut open to let a mower through… and now it’s doing absolutely nothing.

You can see the result:
➡️ Concentrated flow paths forming
➡️ Sediment bypassing the control
➡️ Fence integrity completely compromised

A silt fence only works when it’s continuous and sealed. The moment you “hack a gap,” you’ve essentially created a direct highway for sediment.

If access is needed, do it properly:
Install a stabilised entry/exit point
Use a culvert or controlled crossing
Reinstate and compact the fence immediately after.

This is a classic example of how small shortcuts can lead to non-compliance, environmental risk, and rework costs.

✅ Build it right the first time
✅ Maintain it properly
✅ Don’t cut corners (literally)

Locked in and finished off The majority of this silt fence was already installed — today was about completing the final ...
27/04/2026

Locked in and finished off

The majority of this silt fence was already installed — today was about completing the final section once the wing wall was in place.

Timing it right means everything ties in properly and performs how it should.

✔️ Clean finish around the structure
✔️ Proper toe-in to prevent undercutting
✔️ Fully tensioned and sealed system

This is how you keep control of sediment — staged installs done at the right time, not rushed at the end.

Another tidy result and ready for the next rain event

Another silt fence installed today at Waikato Stadium.We’ve been a bit quiet on socials lately — over the past 5 weeks w...
25/04/2026

Another silt fence installed today at Waikato Stadium.

We’ve been a bit quiet on socials lately — over the past 5 weeks we’ve been managing environmental controls
on the Waihi Gold Mine expansion project.

Unfortunately, there’s a strict no social media policy on-site, so we haven’t been able to share any of the work.

Playing catch-up on our regular jobs
Keeping sites compliant, no matter the scale.

Another solid install completed — 176m of Super Silt Fence for Fulton Hogan’s wastewater upgrades, helping protect sensi...
19/03/2026

Another solid install completed — 176m of Super Silt Fence for Fulton Hogan’s wastewater upgrades, helping protect sensitive wetland areas during earthworks with reliable sediment control.

Doing the returns properly on a silt fence makes all the difference.Returns slow the water, trap sediment, and stop runo...
13/03/2026

Doing the returns properly on a silt fence makes all the difference.

Returns slow the water, trap sediment, and stop runoff from bypassing the fence.
It’s the small details that make erosion & sediment control actually work.

Built right. Installed right. Working when it matters.

We’ve been working behind the scenes to create a brand new website for Erosion and Sediment Control Services (ESCS) — ma...
10/03/2026

We’ve been working behind the scenes to create a brand new website for Erosion and Sediment Control Services (ESCS) — making it easier for our clients to see what we do and how we help keep projects compliant.

From silt fence installation and sediment retention pond fit-outs to advanced erosion and sediment control solutions, our team is committed to protecting waterways and supporting construction projects across New Zealand.

If you’re planning earthworks or need help getting your site compliant with council requirements, check out the new site to see our services, past projects, and how we can help.

Let us know what you think!
Link is in our bio

This cleanfill site was issued a Council Non-Compliance Notice due to no sediment controls in place.Unprotected earth + ...
23/02/2026

This cleanfill site was issued a Council Non-Compliance Notice due to no sediment controls in place.

Unprotected earth + rainfall = sediment leaving site = enforcement action.

We were called in to:
✔️ Install compliant perimeter silt fencing
✔️ Stabilise runoff pathways
✔️ Bring the site back in line with GD05 requirements
✔️ Communicate directly with council to resolve the issue

No drama. No guesswork. Just practical, compliant solutions.

If you’ve received a notice — or want to avoid one — get the right people involved early.

We’ve been installing erosion & sediment controls since 2014 across Auckland & Waikato.

👉 Message us “NOTICE” if you need help
👉 www.escs.co.nz

Pond Not Yet Compliant? We Can Fix That.A sediment pond without the correct fitout can cost you inspections, delays, and...
23/02/2026

Pond Not Yet Compliant? We Can Fix That.

A sediment pond without the correct fitout can cost you inspections, delays, and rework.

At ESCS we specialise in:
✔️ GD05-compliant decant towers
✔️ Correct skimmer arm setup
✔️ Stabilised outlets
✔️ Efficient, tidy installs
✔️ Fast turnaround across Auckland & Waikato

We’ve been installing sediment controls since 2014 — and we understand what inspectors are looking for.

If your team is focused on bulk earthworks, let us handle the compliance side.

👉 Message us “POND” for a fast quote
👉 Or visit www.escs.co.nz

Get it done once. Get it done right.

Another 100m+ of Super Silt Fence installed for this site expansion.Don’t tie up your operators on sediment control — br...
03/02/2026

Another 100m+ of Super Silt Fence installed for this site expansion.

Don’t tie up your operators on sediment control — bring in the right team, keep your people on production, and keep your job running smoothly

Address

Clevedon

Telephone

+64220515012

Alerts

Be the first to know and let us send you an email when Erosion & Sediment Control Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Erosion & Sediment Control Services:

Share