Rockwide Construction & Development Corp. - RCDC

Rockwide Construction & Development Corp. - RCDC Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Rockwide Construction & Development Corp. - RCDC, Construction Company, UNIT 233, CITYLAND 8, # 98 SEN. GIL PUYAT Avenue PIO DEL PILAR, Makati.

RCDC is a newly established construction company wholly- owned by a group of Overseas Filipino Workers (OFWs) composed of engineers, architects, skilled workers, and other professionals.

When it comes to company finances, as the Chairman & President of RCDC, I make sure we do our outmost due diligence, to ...
19/03/2026

When it comes to company finances, as the Chairman & President of RCDC, I make sure we do our outmost due diligence, to ensure SHs best interest.

OT in the office since its holiday tomorrow and before heading back to Davao City…..making sure our office will run smoothly even without my day to day presence. The less your presence is, the stronger the company gets, it means it can stand on its own……parang baby lang yan, when it learns to walk on its own you allow it to soar high.🦅

Today’s site visit at Sentrina Calamba, Laguna to inspect RCDC’s completed housing units and continuous coordination of ...
18/03/2026

Today’s site visit at Sentrina Calamba, Laguna to inspect RCDC’s completed housing units and continuous coordination of punch lists to ensure project completion, compliance, and proper handover.

Also to formally follow-up on the release of our remaining retention after the DLP.

Sentrina’s Project Engineer, Engr. Kevin showed me all the completed units:
✅Kayla Prime Blk.7 Lot 3
✅Kayla Prime Blk.2 Lot 25
✅Kayla Prime Blk.14 Lot 29
✅Arya Prime Blk.2 Lot 27
✅Arya Prime Blk.1 Lot 5
✅Arya Prime Blk.2 Lot 29
✅Amara Expanded Blk.4 Lot 5
✅Amara Expanded Blk.13 Lot 10
✅Amara Expanded Blk.14 Lot 2

RCDC remains committed to delivering quality and securing what is rightfully due.

Busy day today for Engr Kathy Mascardo, Reb Rea CE…..2nd day of processing 12 sets of Building Permits for projects in H...
17/03/2026

Busy day today for Engr Kathy Mascardo, Reb Rea CE…..2nd day of processing 12 sets of Building Permits for projects in Heritage Taguig City.

Thank you Tyra for liaising💜

Reach us at:
17/03/2026

Reach us at:

Re-Organizing👷‍♀️👷‍♂️
17/03/2026

Re-Organizing👷‍♀️👷‍♂️

HAPPY WORLD ENGINEERING DAY TO ALL ENGINEERS!👷‍♀️👷‍♂️🏗️Let's celebrate the incredible contributions of Engineers worldwi...
04/03/2026

HAPPY WORLD ENGINEERING DAY TO ALL ENGINEERS!👷‍♀️👷‍♂️🏗️

Let's celebrate the incredible contributions of Engineers worldwide towards building a better future for all.

HAPPY WORLD ENGINEERING DAY TO ALL ENGINEERS!

Let's celebrate the incredible contributions of Engineers worldwide towards building a better future for all.

CSU Lal-lo Campus Greenhouse Project Work Progress - Feb.1-5, 2026Site Works:1. Substantially completed UV and Netting.2...
05/02/2026

CSU Lal-lo Campus

Greenhouse Project Work Progress - Feb.1-5, 2026

Site Works:

1. Substantially completed UV and Netting.

2. Completion of downspouts’ Gutter and horizontal drain pipes including a 600 mm x 600 mm x 600 mm deep outfall chambers.

3. Substantially did the Anterooms side wall netting and other parts requiring the final termination clippings.

4. Final adjustments for the A Frame to stand 1.5m high.

5. Final assembly for the Shade Net - pillow blocks

6. Final clipping of all loose UV Roof sheets and netting.

7. Fixing the Ceiling and wall insulation inside the Solar Power Control Room.

CSU Aparri CampusWork Progress - Jan.27-Feb.4,2026✅Precast work of Canal Channels✅Preparation of forms and RSB for trenc...
04/02/2026

CSU Aparri Campus

Work Progress - Jan.27-Feb.4,2026
✅Precast work of Canal Channels
✅Preparation of forms and RSB for trench drain
✅Precast work of Drain Channels
✅Concrete pouring for drain channels
✅Installation of Cabinets for Dry Labs

Buhos day! Good job foreman Cocoy.👌💪Praying for good weather🌞 so we can complete our slab concrete pouring today!🌻
04/02/2026

Buhos day! Good job foreman Cocoy.👌💪

Praying for good weather🌞 so we can complete our slab concrete pouring today!🌻

CSU Carig CampusWork Progress - Jan.28-30, 2026✅Fabrication and installation of roof trusses✅Plastering works for second...
29/01/2026

CSU Carig Campus

Work Progress - Jan.28-30, 2026
✅Fabrication and installation of roof trusses
✅Plastering works for second-floor interior columns and walls
✅Layout and leveling preparations for the catch basin

Disclaimer:
Some workers are pasaway ayaw mag PPE👷‍♀️

CSU Lal-lo Campus Greenhouse Project Work Progress - Jan.27-28, 2026Site Works:1. Resuming the leveling of the ground an...
29/01/2026

CSU Lal-lo Campus

Greenhouse Project Work Progress - Jan.27-28, 2026

Site Works:

1. Resuming the leveling of the ground and installation of the bed metal frames for the Soiless Bucket Sytem including the A- Frame fabrication and assembly;

2. Soiless bucket metal framing works x 5 Rows in progress.

3. A- Frame set up completed

4. Completion of Channel profile clips fixing for remaining parts to allow the completion of the netting and UV sheets.

CSU Lal-lo Campus Greenhouse Project Work Progress - Jan.26, 2026
27/01/2026

CSU Lal-lo Campus

Greenhouse Project Work Progress - Jan.26, 2026

Address

UNIT 233, CITYLAND 8, # 98 SEN. GIL PUYAT Avenue PIO DEL PILAR
Makati
1230METROMANILA

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Rockwide Construction & Development Corp. - RCDC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Rockwide Construction & Development Corp. - RCDC:

Share