The more relevant ASTM is ASTM C 1611/C 1611M - 14, which specifies that the maximum height for pouring concrete is 3.7 ...
27/01/2025

The more relevant ASTM is ASTM C 1611/C 1611M - 14, which specifies that the maximum height for pouring concrete is 3.7 meters (12 feet) for concrete having a slump between 150 mm and 230 mm ASTM C 143/C 143M - 15a specifies that the maximum height for pouring concrete is 2.4 meters (8 feet) for concrete having a slump