07/03/2026
We are proud to have successfully completed the heavy lifting of three elevated water tanks (600 m³ capacity each)
in Hail, Saudi Arabia 🇸🇦.
Each tank was prepared and lifted within 10 days,
reflecting strong planning, engineering coordination, and safe ex*****on of complex heavy lifting operations.