06/17/2026
Due to poor ex*****on of prior electrical work Papa John’s in Bardstown had their electrical panel extremely overloaded, which resulted in constant tripping of the main breaker. Knowing the importance of keeping a business running we did about 3 days of work in 1 day. We installed a second service & panel strictly for their heating and cooling equipment. We transferred those circuits from the old panel to the new panel to take the load off the existing panel. Inspection passed this morning & they should be back to delivering pizza’s by this evening 🙌🏻