Duke's marchant engineering ltd

Duke's marchant engineering ltd pure engineering site , consultation place,and sales of all electrical appliances.

Experts in electrical installations ,powerline constructions ,boost pumbs ,solar panels ,vidio surveillance systems ,electric fencing ,automated gates ,assembling of starters ,motor rewinding services

Before you join the construction industry develop a tough skin!Out here things are thick for beginners, worse for the la...
05/27/2026

Before you join the construction industry develop a tough skin!

Out here things are thick for beginners, worse for the lazy and brutal to the pampered men.

If you join the industry, normalize disappointments, betrayals and rejection.

No one cares about you, the one who shows a bit of concern is waiting for an opportunity to stab your back.

The only way is if your father set a good connected company or you build one from scratch and you commit to never ever quit even if the road becomes unbearable.

I wish you all the best, never quit! Im the 3rd contractor with this report .

# Engineering

05/27/2026

I do cctv installation 0702938616/0101216391

05/22/2026
At work 0702938616/0101216391
05/22/2026

At work 0702938616/0101216391

05/09/2026

0702938616/0101216391 Talented

we mean service
05/07/2026

we mean service

0702938616/0101216391 best poshomill
04/25/2026

0702938616/0101216391 best poshomill

Dual poshomil operated by 7.5hp electric motor and 7.5hp  diesel engine best in griding unga no2 only it's free delivery...
04/10/2026

Dual poshomil operated by 7.5hp electric motor and 7.5hp diesel engine best in griding unga no2 only it's free delivery and installation plus one year warranty.0702938616/0101216391

Yesterday something unusual happened in the factory. After a scheduled outage on the 132kV feeder, power was restored ab...
04/10/2026

Yesterday something unusual happened in the factory. After a scheduled outage on the 132kV feeder, power was restored about an hour later. Everything looked perfectly normal — voltage was stable, meter readings were fine, and there were no alarms.

A few minutes later, I received a message on the radio that all motors in the factory were running in the opposite direction while the rest couldn't even start. At first, it sounded strange, but after confirming, it was true. Every motor.. pumps, conveyors, everything. Has reversed. That was when it became clear that the phase sequence had been swapped somewhere upstream during maintenance.

We immediately contacted the substation, and they escalated it further. Not long after, an engineer from town came in to report that their pumps were also running in reverse. I explained that the issue wasn’t from our end but likely from the transmission side, possibly hundreds of kilometers away.

He still insisted on swapping the terminals on his feeder as a quick fix. I asked him what would happen if the transmission team corrected it while he had already swapped his. He said he would simply come back and swap it again.

Soon after, more ports started coming in from nearby towns Grinding machines and other equipment were all running in reverse, showing the issue was widespread.

For about three hours, the problem affected a large section of the 132kV line across the region before it was finally corrected and everything returned to normal.

It really makes you think. One simple phase reversal at the transmission level can affect an entire region. This is why phase sequence is not something to joke with in power systems.your all time systems industrial Engineer Duke

Address

12200 Tech Rd
Calverton, MD

Alerts

Be the first to know and let us send you an email when Duke's marchant engineering ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share