01/29/2026
Finished our deck about a month ago just in time for the weather. Still waiting on the electrician to put in the can lighting so we can do the tongue and groove on the underside of the awning. 20 24-in sono tubes 36" deep. Concrete pad, 2 decks with framework for a hot tub and separate footings for a covered awning. Upper deck is about 60x16 with a 20 ft punch out at the end for the hot tub, lower deck is 14x24 connected into our concrete pad that's about the same size with a walkway.