Bolting down struts with  to plumb in some drains for these batch tanks.            👌    💧
12/16/2025

Bolting down struts with to plumb in some drains for these batch tanks. 👌 💧

Hanging lights in the first room today....going to light up   soon!
12/12/2025

Hanging lights in the first room today....going to light up soon!

Big things happening on our project in King City
09/14/2023

Big things happening on our project in King City

Our project in King City is coming along. Thanks to the team at Systems USA for the rolling benches. The boiler and fert...
08/23/2023

Our project in King City is coming along. Thanks to the team at Systems USA for the rolling benches. The boiler and fertigation building is getting wired up as well as all of the massive underground piping installation leading up to it. We had to get creative to bring all of those pipes and conduits into the building. We also set pump bases for the dab max pumps from getting ready for the irrigation system build. This rocket ship is nearly ready for liftoff 🚀

Hit the ground running today in King City setting up the Boiler Room for the  system for the  we are building out. Some ...
07/10/2023

Hit the ground running today in King City setting up the Boiler Room for the system for the we are building out. Some heavy gear moved today into place, bolted down and leveled. Installed the boiler distribution log we built in the shop. Had a local pro core drill the building for all of the piping going in. 26 holes. Can’t wait to see this room piped.

Some awesome progress on our build in King City California. The first 22k sqft  is almost ready for liftoff🚀 we installe...
06/04/2023

Some awesome progress on our build in King City California. The first 22k sqft is almost ready for liftoff🚀 we installed the controls from , ran gas and water lines as well as making huge progress on the installation! This place is going to be first class. The second house is coming along and almost ready to pull wire. We get our electrical services lit up in a week. We have 10k Amps of 480v power to play with.

 coming through their 420 with some custom cable bundles for our  build
04/20/2023

coming through their 420 with some custom cable bundles for our build

 coming through with the  love ❤️
04/18/2023

coming through with the love ❤️

Good to be back in King City working on this build. Installing the  piping for CO2 supply as well as our feeders for the...
04/15/2023

Good to be back in King City working on this build. Installing the piping for CO2 supply as well as our feeders for the radiant heating. Wrapped up underground conduits and began building out the power room

Happy Strut Saturday!
01/21/2023

Happy Strut Saturday!

Lots of cool projects knocked out in 2022! Can’t wait to see what 2023 has in store!
01/01/2023

Lots of cool projects knocked out in 2022! Can’t wait to see what 2023 has in store!

Tuned up the Dep curtain system in this  yesterday. Working nice now. Fixed all the light leaks and adjusted closure.   ...
10/21/2022

Tuned up the Dep curtain system in this yesterday. Working nice now. Fixed all the light leaks and adjusted closure.