04/22/2026
The customer acquired new upper cabinets, which were installed after removing the existing units. Following the demolition, wall patching was performed, and a textured ceiling was applied to the three rooms and hallway after scraping off the popcorn ceiling. The customer's plan is to procure lower cabinets and countertops that match the upper units at a later time.