Pabst Construction

Pabst Construction Offering quality and dependable work, at an affordable rate. Free quotes and willing to travel.

The customer acquired new upper cabinets, which were installed after removing the existing units. Following the demoliti...
04/22/2026

The customer acquired new upper cabinets, which were installed after removing the existing units. Following the demolition, wall patching was performed, and a textured ceiling was applied to the three rooms and hallway after scraping off the popcorn ceiling. The customer's plan is to procure lower cabinets and countertops that match the upper units at a later time.

Bathroom Renovation Completion. The bathroom underwent a comprehensive remodel, commencing with the removal of all fixtu...
04/01/2026

Bathroom Renovation Completion. The bathroom underwent a comprehensive remodel, commencing with the removal of all fixtures and materials down to the studs. Electrical rewiring was performed to accommodate additional lighting and switch relocation. The entire bathroom was retrofitted with new PEX plumbing. Subsequently, sheetrock installation was completed, and custom vanities featuring onyx countertops and custom freestanding cabinets were installed. Furthermore, an onyx walk in shower, complemented by a frameless sliding shower door.

Have a bathroom that needs remodeled? Other projects in the house that you have been putting off? Please call or text for you free quote.

Didn’t get before pictures of all the rooms, just the living room. Customer had carpet throughout their living room, hal...
03/04/2026

Didn’t get before pictures of all the rooms, just the living room. Customer had carpet throughout their living room, hallway, both bedrooms, both closets, and their hallway closet. We removed all the carpet and carpet pad. Removed the baseboard. Installed new LVP flooring throughout with no transitions in the doorways. We installed matching transition where the flooring butted up to existing tile and around the fire place. Customer wanted to keep existing baseboard so we painted them to freshen it up and installed baseboard back over their new flooring.

Customers basement was unfinished. They decided it was time to finish it up, add a storage room in it as well as a livin...
02/13/2026

Customers basement was unfinished. They decided it was time to finish it up, add a storage room in it as well as a living room, and make it a little more cozy. Insulated and framed the exterior wall with a smooth sheetrock finish. Framed up a wall to divide the storage room from the living room. LVP flooring with stained oak finish. And a set of double Knotty Alder doors, stained to match the oak trim.

Bathroom remodel. Tore out bathroom door and installed sliding barn doors. Tore out existing tile an installed new water...
01/12/2026

Bathroom remodel. Tore out bathroom door and installed sliding barn doors. Tore out existing tile an installed new waterproof LVP flooring. Tore out whirlpool bath and patched in the Sheetrock. All new paint and baseboard; along with vanity, mirror, and all new lighting. Removed fluorescent lighting in kitchen, patched in ceiling, and installed new lighting around the house.

Got a project you have been putting off or having troubles finding someone to work with you? Please reach out to me for your free estimate.

Today we take a moment to remember this brave men and women who ran toward danger, when others were fleeing. We continue...
09/11/2025

Today we take a moment to remember this brave men and women who ran toward danger, when others were fleeing. We continue everyday to continue your legacy and your courage. We pray for those families affected on that day, and we continue to pray for the men and women who are still paying today with health concerns. We pray our nation could come together as one like they did on Sept 12. Thank you 343, your lives will never be forgotten.

Did a little bathroom makeover. Customer wanted to keep the shower but add in a new wall hanging cabinet, new vanity and...
08/14/2025

Did a little bathroom makeover. Customer wanted to keep the shower but add in a new wall hanging cabinet, new vanity and sink, and a new toilet. Little bit of Sheetrock work to clean it up.

Whole house flooring job wrapped up here. All flooring laid in one direction throughout house with zero transition strip...
07/30/2025

Whole house flooring job wrapped up here. All flooring laid in one direction throughout house with zero transition strips. No transition strips really cleans the look up in doorways when possible.

Been a little behind on posting work. A while back, was able to get a deck built in a backyard. Nice cedar deck.
07/21/2025

Been a little behind on posting work. A while back, was able to get a deck built in a backyard. Nice cedar deck.

Photo dump. Was busy the last several weeks turning this place around. When I walked in the demo process had been starte...
05/16/2025

Photo dump. Was busy the last several weeks turning this place around. When I walked in the demo process had been started. The load bearing beam that was placed in wasn’t fit for the house, so I took it out and replaced it with the proper beam to support that size of load. Placed paneling in the kitchen, hallway, and bathroom that was selected by the customer. Patched in the Sheetrock in the living room and breaker box room. Laid LVP flooring through the entire house.
The customer will be painting the walls and ceilings. They will also have all the outlets and light switches replaced as well.

If you have a project that you have been in mind or have been putting it off, feel free to reach out for your free quote.

Pabst Construction does offer monthly installments as well.

Address

Hays
Hays, KS

Telephone

+17856898206

Website

Alerts

Be the first to know and let us send you an email when Pabst Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Pabst Construction:

Share