West Roofing Systems, Inc.

West Roofing Systems, Inc. Commercial roofing contractor located in LaGrange, Ohio. We've been a company since 1979.

Most of our work comes from restoring commercial roofs with spray foam roofing and/or silicone roof coating systems.

You can’t always see what’s happening underneath a roof.When we recently inspected the spray foam roof at Amherst Fire D...
08/27/2026

You can’t always see what’s happening underneath a roof.

When we recently inspected the spray foam roof at Amherst Fire Department, an infrared scan told us there was more going on beneath the surface.

Of roughly 12,000 square feet, the IR scan identified about 400 square feet of wet insulation.

Simple scope-of-work:

- Used infrared technology to identify the affected areas
- Removed the wet insulation
- Replaced it with new spray foam
- Recoated the entire 12,000-square-foot roof

The result?

A restored spray foam roof with problem areas addressed before they could become bigger problems.

That’s why proper roof inspection matters. A roof can look fine from the ground while moisture quietly causes damage beneath.

Swipe through the photos to see the roof before, during the repair, and after the recoat.

Another roof protecting an important local facility—and another problem caught before it became much bigger.

Over 230,000 SF of roofing completed. Here are some start-to-finish photos of a silicone coating over an existing metal ...
08/25/2026

Over 230,000 SF of roofing completed. Here are some start-to-finish photos of a silicone coating over an existing metal roof in Bedford, Ohio. Two roofs. 20-year renewable warranties granted.

Silicone-coated wall at Sandusky High School. We worked with the silicone manufacturer to custom-make the color to match...
08/20/2026

Silicone-coated wall at Sandusky High School. We worked with the silicone manufacturer to custom-make the color to match the school's preference.

Before, in-progress, and (blurry) but finished photos of a 34,000SF EPDM roof in Beachwood that was revived by installin...
08/18/2026

Before, in-progress, and (blurry) but finished photos of a 34,000SF EPDM roof in Beachwood that was revived by installing a hybrid-system. Some foam. Some coating. Here are some scope-of-work items:

- Installed 20 new vents
- Installed custom-fabricated (in-house) new perimeter edge metal
- Foam installed to reduce standing water areas, encapsulate old skylights, and seal new edge metal
- Seams reinforced with extra striping of coating
- Coating installed on entire roof

10-year renewable warranty granted.

What a transformation! High-Solids silicone coating installed on school's exterior walls. See before, in-progress, and f...
08/12/2026

What a transformation! High-Solids silicone coating installed on school's exterior walls. See before, in-progress, and finished photos.

Unfortunately, some roofs need to be torn off before a new one can be installed. Evidence with core samples and infrared...
08/07/2026

Unfortunately, some roofs need to be torn off before a new one can be installed. Evidence with core samples and infrared scans justify the tear-off. Here are some before, in-progress, and finished photos of a completed spray foam installation on a 16,000 sq. ft. school roof in Cleveland, Ohio.

Before, in-progress, and after footage of Buckeye High School in Medina, Ohio. 13 different roof sections. Some foam, so...
07/31/2026

Before, in-progress, and after footage of Buckeye High School in Medina, Ohio. 13 different roof sections. Some foam, some coating…depending on the existing condition and membrane.

Video - start-to-finish of Bearing Manufacturing - roof coating system over existing metal roof - 63,950 sq. ft. -
07/28/2026

Video - start-to-finish of Bearing Manufacturing - roof coating system over existing metal roof - 63,950 sq. ft. -

Commercial roof restoration project completed at Bearing Manufactur...

Restoring an old spray foam roof at Firelands Middle School in Oberlin, OH. Removed the wet foam, fixed cracks, installe...
07/23/2026

Restoring an old spray foam roof at Firelands Middle School in Oberlin, OH. Removed the wet foam, fixed cracks, installed new foam and coating. Brand new 10-year warranty granted. See before/after photos.

From blow-off to repair. Airport hanger's roof blew off, but instead of completely ripping everything off (including goo...
07/21/2026

From blow-off to repair. Airport hanger's roof blew off, but instead of completely ripping everything off (including good membrane and dry insulation), we only removed the damaged and wet areas, and tied everything together with the spray foam roofing system.

Address

271 E. Commerce Drive
Lagrange, OH
44050

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when West Roofing Systems, Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to West Roofing Systems, Inc.:

Shortcuts

Share