10/24/2026
Yall take a gander at this beautiful start to a 160 yard driveway. This is 54 yard overlay over existing asphalt driveway. Thank you Mr. Kevin Hatfield for allowing me take care of this for you. I look forward to seeing you in 3 weeks to start phase 2 of this project. Thanks to boys for busting there backs on this one. Doesn’t look like much, but man this thing was steep around that switchback in the driveway. Thanks to Patriot Concrete Pumping for pumping the first 45 yards. Awesome job done by his crew. Huge thanks to TriCity Concrete LLC for having them trucks there like yall did and making it easy on us. For any of your concrete needs, call/text me or message me here and let’s see if I can make you as happy as Mr. Hatfield is right now. ALL IN A DAYS WORK!!!