03/31/2026
First project of the year is complete. It was tricky with the septic tank. The customer was having issues with the septic and could not find the lids. Turns out they were under the existing sidewalk. So we came up a plan to install a paver walkway and steps to try and mimic the old sidewalk. Once started the plan changed quickly due to a gas line coming from the propane tank. And the end result is much better than the original plan.