05/15/2025
This was Phase 2 of a project. We already rewired the entire second floor, now with their own panel.the main disconnect will still be located in the basement. Added a new panel for the first floor and basement. Next phase is bringing the riser up to power the panel on the 2nd floor. ⚡️ ❤️