When performing on-site inspections, we make it a habit to review the roof rigging including safety lines before ever ge...
08/11/2026

When performing on-site inspections, we make it a habit to review the roof rigging including safety lines before ever getting on a swing stage. On this project, the rigging was in the process of being erected. While we did not observe anything "wrong" with the rigging itself, we did have a concern structurally. Assuming the counterweight plates are 50 pounds each, there is approximately 4500 pounds of load in a very concentrated area. Luckily, the area of concentration happened to be over a column in this instance. Past luck does not indicate future success however. Had the column not been in this location and all of the load been midspan between columns, this could have been a very different post.

The Problem: Spalling concrete slab inside a stairwellThe "Repair": Apparently using carpet adhesive is a good repair fo...
07/31/2026

The Problem: Spalling concrete slab inside a stairwell

The "Repair": Apparently using carpet adhesive is a good repair for concrete

The Result: The repair area failed within one week, money was spent, and further repairs are still required.

The Takeaway: CARPET ADHESIVE IS NOT INTENDED TO REPAIR CONCRETE DEFICIENCIES.

We wish that this was a joke, but it is not. In lieu of making the proper repairs, the association instructed the carpet installer to repair the spalled area so that they could proceed without delay. Now they are left wondering why they spent money on a repair that simply was not correct and did not even last a week. Unfortunately, situations like this are all too common and many deficiencies go without proper repairs.

Sometimes pictures can be deceiving. A picture from the ground of this Post Tension grout pocket was sent by the client ...
07/20/2026

Sometimes pictures can be deceiving. A picture from the ground of this Post Tension grout pocket was sent by the client and at a glance, it appeared that the grease cap was still in place and that there was no structural damage. When a 360 degree camera and a long selfie stick was used to access the third floor slab from the roof, the up close pictures told a different story. In the picture it can be seen that the post tension tendon is protruding through the grease cap indicating a potential failure of the tendon. Further investigation is underway to determine the extent of the damage and the necessary repairs.

This was intended to be a full depth repair. During the pour, the contractor was a bit short on concrete, took lunch, an...
07/06/2026

This was intended to be a full depth repair. During the pour, the contractor was a bit short on concrete, took lunch, and proceeded with the pour after lunch creating a very noticeable cold joint. Prior to our inspection, we were told by the contractor that there was a small problem with a pour and that it was "cosmetic" and that everything was fine. During our inspection, we saw otherwise and informed the contractor that this area needed to be chipped out and repoured to meet the project specifications. This illustrates the importance of having qualified personnel performing construction oversight.

Cracks through the grout pockets, deteriorated anchors and wedges, and "slipping" tails all indicated that repairs were ...
06/08/2026

Cracks through the grout pockets, deteriorated anchors and wedges, and "slipping" tails all indicated that repairs were necessary on the post tension system of this building. The orange marking paint was used to identify deficiencies from the ground which was later used to document the repairs and provide direction to the contractor. Our simple yet effective way to make sure that everyone is on the same page.

Repurposing a space can be tricky. This store bought two adjacent units and wanted to connect them to make a bigger area...
06/01/2026

Repurposing a space can be tricky. This store bought two adjacent units and wanted to connect them to make a bigger area. The problem was that there were two load bearing walls and an expansion joint between. To accommodate, two adjacent steel frames were installed to carry the weight of the wall and tie beam above. An analysis was also performed to make sure the existing shear wall was still adequate to carry the lateral loads with the openings removed.

This is not deteriorated rebar and should not be treated as a simple spall repair. This is a deteriorated post tension a...
05/27/2026

This is not deteriorated rebar and should not be treated as a simple spall repair. This is a deteriorated post tension anchor, and that anchor is holding a 1/2" tendon that is under 27,000 lbs of force and can cause significant damage to property or repair technicians if repaired improperly. Post tension repairs are inherently dangerous and should only be performed by qualified personnel and overseen by experienced, licensed, design professionals. A search through the Post-Tensioning Institute's database of qualified personnel is a great starting point for a project like this.

We were called for a pre-pour inspection following the mechanical cleaning of the existing reinforcement and were told t...
05/18/2026

We were called for a pre-pour inspection following the mechanical cleaning of the existing reinforcement and were told that they were "ready for concrete". When we got on site, we could tell that the existing reinforcement had significant cross section loss and that supplemental reinforcement was needed. Just because the steel is clean, doesn't mean that the repair is complete. Following the plans and specifications is critical for long term performance of the repairs.

05/15/2026

When you go to sound a small spall and water leaks from behind the unsound concrete, you know that you are in for trouble. When that water happens to be chlorinated and coming from the pool above, it makes the situation even worse. Widespread deterioration of the reinforcement in this pool shell was observed as a result of cracks and leaks in the shell.

This wood wall was already being repaired by the time we were called to take a look. The difficult thing about framed wa...
04/27/2026

This wood wall was already being repaired by the time we were called to take a look. The difficult thing about framed walls is that there is often no indication how far the deterioration spreads until the repairs begin resulting in many different conditions that have to be resolved in the field. In this case the deteriorated members were replaced with new members of similar size. The strapping for continuity of the load path from floor to floor did not comply with the original construction plans and is insufficient. It was recommended that additional straps and ties be added for code compliance prior to the replacement of the sheathing.

Address

PO Box 4448
North Fort Myers, FL
33918

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 4pm

Telephone

+12399904972