10/30/2026
Out with the old… In with the NEW ✨
New patio and sidewalks, including the new hot tub section. Buried electrical conduit for the hot tub, and buried a sleeve to fish the new gas line back over to the house. 🔥
And down below, we did a new half garage floor and apron in front of the garage. 🛞
** more finish pictures to follow 📸