03/12/2026
Here's a completed rough in. This 5 level split home project took some time because of changes and weather. We brought in a new sewer, new main drain in basement, new water main inside the house. 2 1/2 baths. This home had 2 kitchens 1 with a pot filler on the stove. Master with his and hers shower, a 6' soaking tub w/Roman faucet and double vanity. Children's bathroom had single shower, 5' soaking tub w/wall mounted diverter, and also a double vanity. Customer decided on adding propane gas too there house for their furnaces, it will have a combo water/boiler Navien and also a generator. The boiler side will serve for heated floors in each bathroom and the first story of the house which sits on a slab. Everything up to code, passed all inspections and now we're just waiting to finish the floor on the slab. We're excited to see this finish product all ready to be polished and shined💎💎💎