06/03/2026
Your electric bill is climbing. Most of it isn't your fault. Part of it is.
Here's the part that isn't: AI data centers are pulling so hard on the grid that they're rewriting what everyone else pays. In the PJM region, which covers Pennsylvania, New Jersey, Maryland, Delaware and beyond, the grid's own independent market monitor pinned 63% of this year's capacity price increase on data center demand. That's roughly $9.3 billion passed straight through to ratepayers. You're footing part of that bill whether you like it or not.
You can't fight the grid. But here's the part you can control.
Your chiller is almost certainly the single largest electric load in your building. And it's quietly losing efficiency right now. A fouling layer on the condenser tubes thinner than a sheet of paper, about 0.6mm, can cut chiller efficiency by roughly 20%. Your cooling tower feeds that system, and when scale, sediment and biological growth build up, the whole loop works harder for the same result. None of it trips an alarm. It just shows up as a bigger bill every month.
That's a neglect tax. And you're paying it on top of the data center surcharge.
Clean condenser tubes. A properly treated cooling tower. Correct refrigerant charge. Calibrated controls. Across a commercial system, structured maintenance consistently recovers 15 to 25% of HVAC energy use. On your biggest piece of equipment, the single fix can be larger than that.
At Building and Air Maintenance, that's the whole job. Chillers, cooling towers, air handlers. We keep them running the way they were designed to, so when the next rate hike lands, you're not also bleeding money out of a dirty tube bundle.
The grid is out of your hands. Your equipment isn't.
Serving institutional, commercial and government facilities across PA, NJ, MD, DE and southern NY. NADCA-certified. Let's find the money your equipment is wasting.
π Building and Air Maintenance, LLC | buildingandair.com | [email protected]