06/09/2026
Another 150A overhead service upgrade completed in a single day β‘οΈπ β just 8 hours start to finish β±οΈπͺ
Two new ceiling fan-rated box locations installed with switch locations π¬οΈπ‘π§°
Full panel labeling completed π·οΈπβ‘οΈ and AFCI (arc fault) protection added for new circuit extension π₯π«β‘οΈ
Passed final inspection with no issues βοΈππ
The Calabreeze Electric crew makes it look eazy breezy ππ§β‘οΈπ΄π¨