02/03/2026
This scope of work involved the conversion of one restroom into two within each unit of a duplex, resulting in a total of four completed bathrooms. The project required the coordination of plumbing, electrical, and HVAC specialty trades. Interior finishes included drywall, texture, and paint, along with the installation of quartz countertops, sinks, vinyl showers, fixtures, toilets, flooring, and vanities.