08/27/2026
Water is what turns a small defect into a large one. Once it reaches the base through an open crack, every freeze-thaw cycle widens the opening.
An August assessment tells you what to fix before winter and what to budget for next year. Proper crack seal needs surface temps above 50°F, so in the Northeast and Midwest your last practical window of opportunity is October.
paveconnect.com · (866) 591-7284