06/07/2026
June is also off to a busy start with us finalizing the old Worcester Morgan Construction Crescent Street Utility disconnects for Regional Demolition. This project had 7 Water disconnects consisting of 3-8” sprinklers services, 1-6” sprinkler service, 1-4” domestic service, 1-3” elevator water service (yes elevators use to be controlled by water power), and a final 2” domestic to wrap up the water portion. No two were the same and some needed to be just plates, others capped, and one needed a section of 12” cast iron main removed and replaced. Most of these services were originally installed late 1800’s through the early 1900’s with multiple repairs, main replacements, and many unknowns. Also can’t forget the old Cobble Stone roadway we found under the asphalt with this area of the City being that old. Thank you for our teams hard work and also the Assistance of A. J. Belculfine Vacuum Services with this Project.