Streamline Construction Corp.

Streamline Construction Corp. Phillip Knorr,
Owner

Finished up this beauty right before the big storm.
03/03/2026

Finished up this beauty right before the big storm.

02/24/2026

With everyone stuck inside all day you may not be thinking of your gas furnace or hot water heater exhaust. Take a second and check it out, it could save your life!! 99% of storms this is probably no issue, but I've got some 6-7 ft high drifts in my yard that I know could cover some pipes. Stay safe!

Nice little Presidents' Day project. New full row of cabinets replacing the single shelf that was placed there when the ...
02/16/2026

Nice little Presidents' Day project. New full row of cabinets replacing the single shelf that was placed there when the house was initially built. Topped off with a solid butcher block shelf the full width of the laundry area. All pieces of the counter are fully removable for any repair or replacement that may be needed on the machines.

Most days it's just work, but sometimes you to do special things. Taking logs cut down on the property to the sawmill, t...
02/05/2026

Most days it's just work, but sometimes you to do special things. Taking logs cut down on the property to the sawmill, then taking what you get and turning into beautiful pieces is very rewarding. The floating shelves in the mudroom and over the kitchen sink as well as the wraparound mantle will enjoyed every day!

Got this master bath just about ready for tile. Assembled the shower and now sitting for 24 hour flood test, also got th...
01/21/2026

Got this master bath just about ready for tile. Assembled the shower and now sitting for 24 hour flood test, also got the heated floor cable in.

Great progress happening over the past couple of weeks. Can just about see the finish line on this one!
01/18/2026

Great progress happening over the past couple of weeks. Can just about see the finish line on this one!

If you need a guy that trowels, I've got many onsite today!  Getting the rest of the concrete poured and Legendary Plast...
12/11/2025

If you need a guy that trowels, I've got many onsite today! Getting the rest of the concrete poured and Legendary Plastering, LLC killing it inside as usual.

What plans would you have for an attic like this?  3760sf of useable floor space, 10' high ceiling and a bonus...it's he...
12/05/2025

What plans would you have for an attic like this? 3760sf of useable floor space, 10' high ceiling and a bonus...it's heated and cooled!!

Now installing front yard fire pits, not sure if we went too big with this one though!! Hahaha
11/22/2025

Now installing front yard fire pits, not sure if we went too big with this one though!! Hahaha

Turning a roll of rubber roofing into a waterproof rain system on a deck.
11/22/2025

Turning a roll of rubber roofing into a waterproof rain system on a deck.

Next level pantry....
11/09/2025

Next level pantry....

Address

Main Street
Taunton, MA
02780

Opening Hours

Monday 7am - 7am
Tuesday 7am - 7pm
Wednesday 7am - 7pm
Thursday 7am - 7pm
Friday 7am - 7pm
Saturday 7am - 12pm

Telephone

+15083269346

Website

Alerts

Be the first to know and let us send you an email when Streamline Construction Corp. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Streamline Construction Corp.:

Share