RCI Builders Incorporated

RCI Builders Incorporated For over ten years, RCI Builders Incorporated has been working as a general contractor to help build communities and make blueprints come to life.

Working Together - Building Others Up

Steel is up at 8901 Melrose. The first structural columns and beams are in place for this ground-up, two-story commercia...
09/02/2026

Steel is up at 8901 Melrose. The first structural columns and beams are in place for this ground-up, two-story commercial building at the corner of Melrose and La Peer.
 
Through September, crews are continuing concrete stem walls and slab work, with slab work carrying through mid-October.
 
Owner: Charing Cross Partners
Architect: Montalba Architects
 

08/25/2026

Checking in with the 395,000 SF multifamily project in Thousand Oaks. Building A’s Level 1 pours wrap up this week, then crews shift into Level 2 walls and columns, working west to east.

Building B has four pours rolling through the coming weeks, lumber drops soon for framing and Crane 1 goes up for a multi-day install in late September.

Architect: KTGY
Owner: The Latigo Group

Showcasing the athletic center we completed for Thomas Aquinas College in 2022 17,000 SF of stucco and terra cotta detai...
08/04/2026

Showcasing the athletic center we completed for Thomas Aquinas College in 2022
 
17,000 SF of stucco and terra cotta detailed to match the existing campus architecture. Inside is a hardwood gym under exposed glue-lam beams with separate men’s and women’s weight rooms with locker rooms tying directly to the pool deck. building is anchored by a tower housing two 32-foot climbing walls and a bouldering wall.

Outside, a 6-lane waveless lap pool sits between the building and the playing fields: two lit tennis courts, a basketball court alongside and new soccer and baseball fields to the west. An arched vestibule opens onto the picnic area.
 
Architect: Harrison Design
Owner: Thomas Aquinas College
 
ThomasAquinasCollege

07/30/2026

SCE’s street utility work is complete and footing pours are underway at 8901 Melrose.
 
Structural steel goes up mid August, shotcrete stem walls follow in September and we’re prepping for a mid-October slab-on-grade pour.
 
Ground-up two-story commercial building at Melrose and La Peer, in the heart of the West Hollywood Design District.
 
Architect: Montalba Architects
Owner: Charing Cross Partners


We’re pleased to announce the completion of our tenant improvement project for Neros Technologies.What began as a 12,500...
07/14/2026

We’re pleased to announce the completion of our tenant improvement project for Neros Technologies.

What began as a 12,500 SF interior renovation expanded into approximately 100,000 SF of total scope. This includes 85,000 SF of warehouse electrical infrastructure delivered across three phases while the client remained operational in the space.

Fast-track projects with evolving scope demand disciplined coordination between ownership, design and field teams.

Architect: Jose Ruelas, SAA
Owner: Joshua Forster, Neros

07/07/2026

Take a site walk at Oakwell in Thousand Oaks with our superintendent. The 395,000 SF multifamily projects’ slab-on-grade foundation and walls are done along with utilities. Oakwell will be going vertical this month.

Architect: KTGY
Owner: The Latigo Group

06/23/2026

Take a site walk with our superintendent at the 110,766 SF Churchill multifamily project in Simi Valley. Stucco is wrapping up, while lathing and the apartment amenities progress on the courtyard side.

Architect: Flewelling & Moody
Owner: Itule Real Estate Group

06/16/2026

Take a site walk at 8901 Melrose in West Hollywood with Superintendent Brian Tennant. The 9,000 SF commercial project will be a luxury retail showroom with a live tree inside.
 
Architect: Montalba Architects
Owner: Charing Cross Partners
 

06/09/2026

Concrete’s down and the asphalt first lift is in at Oakwell in Thousand Oaks. Civil and dry utilities are complete underground for the 395,000 SF project. Building A decking starts in June and Building B decking will begin decking shortly after.
 
Architect: KTGY
Owner: The Latigo Group
 

05/27/2026

Floors are filling up at the 110,766 SF Churchill multifamily project in Simi Valley. Stucco is going up on all elevations and MEPF rough-in is pushing through floors two and three ahead of interior finishes at the Churchill.

Owner: Itule Real Estate Group
Architect: Flewelling & Moody

Address

Thousand Oaks, CA
91359, 91320, 91360, 91361, 91362

Alerts

Be the first to know and let us send you an email when RCI Builders Incorporated posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share