05/31/2026
New septic install this week. The rain didn’t make it easy on us, but we managed to slip in a few other jobs in the mean time
This job called for removal of the old 1000 gallon tank and replaced with a new 1250 dual compartment
The old drain field was completely saturated and on top of the ground. We dug a sump and pumped 800 gallons out of the old bed so we could work to install the new one
Was a productive week with some beautiful days in between the rain