06/02/2026
“While the end result looks seamless, the steps behind the scenes were more extensive than one might think.” — Project Manager Douglas Brown
➡️ Three things our team tackled to lay the groundwork for this kitchen transformation:
1. Extended an exterior wall 3 feet to accommodate the new layout. This required a structural engineer, careful attention to ceiling joist support, and ultimately the installation of a steel beam to carry the load from upstairs.
2. Relocated the home’s electrical meter to make the wall extension possible, coordinating with Duke Energy, our electrician, and the homeowners still living in the home.
3. Removed upper cabinets to open the wall and create seamless flow between the kitchen and sunroom.
The benefit or working with a full-service design-build firm like ICON? We juggled all these details, not the homeowner!
Interior Design:
Before Photos: MLS