09/19/2026
⚡ FRIDAY. WHAT A WEEK.
Final three days. All hands on deck. A lot of work, a lot of laughs, a few lunches together, and one hell of a push to bring this project home.
For the latter part of the week we tackled an old Burncoat two-family 400A service upgrade along with a new landlord panel, hallway lighting, smoke/CO detection, exterior lighting, conduit work and basement lighting rework. It was the kind of project that required everyone to pull in the same direction, and that’s exactly what this crew did.
But standing here at the end of a long week, the work itself isn’t really what I’m thinking about.
It’s the guys.
There was a time when I never could have imagined getting to this point in my career. Having a crew of guys I genuinely enjoy working alongside, eating lunch with, solving problems with, laughing with, and grinding through the difficult days with is something I don’t take for granted. They put forth a standard that was set long ago.
We worked hard these past three days. Everybody contributed. Everybody stepped up. And we brought another big one across the finish line together.
I’m incredibly grateful for what we’re building at Bergeron Electrical, but even more grateful for the people I’m getting to build it with.
Blessed beyond measure. Proud of this crew. And thankful for another week doing what we do. ⚡
Josh, Johnny and Kevin, thank you for your passion and dedication to what we are building. 💪🏽
Enjoy the weekend. We’ve earned this one.