28/05/2026
π₯ π΄σ §σ ’σ ·σ ¬σ ³σ Ώ Solid effort over the last week pulling this job together for over in Solva.
A stunning location but itβs fair to say the inside was in need of abit of work; and leaking heat like a sieve!
Newly insulated and plaster boarded ceilings upstairs got prepared and plastered, and then rendered, prepared and plastered the remodelled kitchen and utility downstairs. A lot of graft gone in from everyone, but the results are worth it.
Back in a few weeks to finish off around a new front door and some external making good around new windows.
π΄σ §σ ’σ ·σ ¬σ ³σ Ώ π₯