Commit Construct

Commit Construct 5+ yrs of trusted builds in Cape Town: Renovations, Design, Plumbing, Flooring & more.

This project involved the complete restoration of an ageing timber floor. Damaged floorboards were removed, the deterior...
29/07/2026

This project involved the complete restoration of an ageing timber floor. Damaged floorboards were removed, the deteriorated substructure was exposed and repaired, and new structural timber was installed where required. A new flooring substrate was fitted before completing the installation with a durable wood-look vinyl finish, delivering a strong, level, and long-lasting floor.

Indoor Pool Deck UpgradeWe installed a premium aluminum substructure with composite decking to create a strong, corrosio...
28/07/2026

Indoor Pool Deck Upgrade
We installed a premium aluminum substructure with composite decking to create a strong, corrosion-resistant, and low-maintenance access deck over the service trench. This solution combines structural integrity with a modern finish, making it perfect for high-moisture environments while allowing future access for maintenance when required. Eva-Last Virgin Active SA

18/06/2026

Complete bathroom renovation completed from floor to ceiling. A modern transformation that combines style, functionality, and quality craftsmanship.

Pool Deck TransformationOut with the old, in with the new! We removed the deteriorated timber substructure and decking, ...
11/06/2026

Pool Deck Transformation
Out with the old, in with the new! We removed the deteriorated timber substructure and decking, installed a brand-new structural framework, and finished it with low-maintenance composite decking for a fresh, modern look.
Eva-Last

30/04/2026

Before:
Heavy, dated design with bulky bathtub and dark tones closing in the space.
After:
Bright, open, and modern—featuring a frameless glass shower, floating vanity, and elegant neutral finishes

What was once a worn, underused patio is now a fresh, contemporary space made for relaxing and entertaining.
21/04/2026

What was once a worn, underused patio is now a fresh, contemporary space made for relaxing and entertaining.

Before: Limited space with outdated fixturesAfter: Stylish, functional, and refreshed space.
20/04/2026

Before: Limited space with outdated fixtures
After: Stylish, functional, and refreshed space.

“Home of the Hockey Teams”A Newly erected Dug-out Hoërskool De Kuilen High School Eva-Last
17/01/2026

“Home of the Hockey Teams”

A Newly erected Dug-out Hoërskool De Kuilen High School
Eva-Last

Before: A dark, reflective space with heavy finishes.After: A light, natural, and inviting bathroom featuring green text...
30/11/2025

Before: A dark, reflective space with heavy finishes.
After: A light, natural, and inviting bathroom featuring green textured tiles, a floating vanity, brass accents, and a softer colour palette.

Before: The outdoor area consisted of dated paving and lacked a sense of visual flow.After: A beautifully installed mode...
17/11/2025

Before: The outdoor area consisted of dated paving and lacked a sense of visual flow.
After: A beautifully installed modern deck enhances the pool surround, providing a contemporary, low-maintenance surface that adds warmth, style, and sophistication.

Address

Cape Town

Website

Alerts

Be the first to know and let us send you an email when Commit Construct posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Featured

Share