RailFirst Wagon Production Centre – Refurbishment Complete
Final reveal of the completed epoxy flooring refurbishment at the RailFirst Wagon Production Centre.
Our team delivered 3,800m² of heavy-duty industrial epoxy flooring, along with 500m² of rip-out and relay works, including extensive heavy repairs and installation of safety walkways throughout the facility.
Working with floors in parts of the building that are over 100 years old, this refurbishment required careful preparation and restoration to bring the surfaces back to life for modern industrial use.
Proud to have been part of upgrading such an important piece of rail infrastructure.