14/04/2026
β‘ Two smart solutions. Zero trip hazards.β‘
We recently completed a major commercial electrical upgrade at South West Community College, and this project is a perfect example of what thoughtful electrical planning looks like in a busy, people-heavy environment.
The brief? Extend power access across multiple rooms without a single extension cord in sight.
Here's what we delivered:
β
Ducted skirting GPOs β flush-mounted double power points installed directly into purpose-built skirting ducts running the full length of each room. Clean, compliant, and power exactly where it's needed.
β
Hanging ceiling power points β where floor-level access wasn't practical, we brought power down from above. Neat, safe, and completely out of the way.
Two different problems. Two tailored solutions. One job done right.
If your team is stretching extension cords across floors or daisy-chaining power boards just to get power where it needs to go β that's a safety risk and a liability waiting to happen.
We design and install solutions that are built to last, built to code, and built to work for how your space actually operates.
π 0408 887 950
π§ [email protected]
π lcssouthwest.com.au
WA Electrical Contractor Licence EC16689 | WA Police Registered SA51338