28/05/2026
Another container fit-off wrapped up — this one set up as a clean office/workshop space with a Mitsubishi Heavy Industries 3.5kW system keeping things cool through the WA heat.
Full conduit install throughout for a neat, durable finish built to handle workshop conditions. Practical setup, tidy run, and ready for work. 🔧❄️