Innogy Electrical Services

Innogy Electrical Services At Innogy Electrical, we pride ourselves on quality, excellence and an fanatic attention to detail

Multi switchboard upgrades and relocations ⚡️⚡️Working with  to renovate and restore four 100 year old adjoining propert...
16/10/2025

Multi switchboard upgrades and relocations ⚡️⚡️

Working with to renovate and restore four 100 year old adjoining properties with mixed retail and residential apartments, we completed the following level 2 works

✅ 4 x overhead service disconnections from the front of the properties
✅ 3 x 100A UGOH services and 1 x new OH service
✅ Main switchboards for all four properties moved to the rear of each property
✅ 8 x redundant NMI abolishments
✅ 5 x Smart meter upgrades

For switchboards, meter panels, overheads and underground’s, we’re her to help with your next project!

JOIN THE INNOGY TEAM! ⚡️⚡️If you’re passionate about the electrical industry, looking for a change or a new challenge, I...
16/09/2025

JOIN THE INNOGY TEAM! ⚡️⚡️

If you’re passionate about the electrical industry, looking for a change or a new challenge, Innogy electrical is looking for you!

We’re looking for a qualified electrician and 2nd or 3rd year apprentice.

You can expect competitive pay, commissions, varied and challenging work (every day is different), quarterly team activity days and a learning and fun work environment.

Send your resume to [email protected]

200A supply upgrade recently completed for .electrical at the huge Sylvania build right by the water. ✅ Full stainless S...
20/06/2025

200A supply upgrade recently completed for .electrical at the huge Sylvania build right by the water.

✅ Full stainless Steel MSB by
✅ 200A overhead service and consumers mains
✅ 200A sub main circuit 45m underground into the house
✅ New private pole

Thanks to for help with the connection on the super high pole with no way to get a ladder on it 🙌🏼

If you’re looking for or need a power upgrade for your home or project, get in touch! We’d love to help.

#

We recently completed this full upgrade of meter panel, private pole, overhead service and switchboard with addition of ...
17/06/2025

We recently completed this full upgrade of meter panel, private pole, overhead service and switchboard with addition of backup generator and transfer switch setup.

The rural property occasionally experiences outages which affects their ability to run clean water and access the work sheds. The backup generator will run the majority of the property until the grid supply is restored.
Another fun project working with

SOLAR & BATTERIES ☀️☀️🔋🔋We recently completed the installation of 8.6kW of bi-facial panels with 10kWh battery storage h...
27/08/2024

SOLAR & BATTERIES ☀️☀️🔋🔋

We recently completed the installation of 8.6kW of bi-facial panels with 10kWh battery storage has helped our customer reduce their grid dependency by over 60%, and we’re still in winter!

The bi-facial panels capture the sun’s energy on both sides and with the multi pitched white colourbond roof, there’s plenty of reflected light hitting the backs of those panels.

All coupled with micro inverters and batteries, this system is already exceeding expectations. As always, our systems are installed with Hollywood rails and racking.

24.6kW solar system recently completed for a newly refurbed racing horse stables. 4 strings of 14 panels will provide up...
04/08/2024

24.6kW solar system recently completed for a newly refurbed racing horse stables. 4 strings of 14 panels will provide up to 20kW of three phase AC power to the stables which include DALI remote controlled lighting and large fans to keep the horses cool during the summer.

As long as the sun is shining, this solar system will cover the power requirements year round ☀️☀️

12.6kW SolarEdge system with Trina 440w panels recently completed in Beecroft. This system included two arrays across tw...
09/04/2024

12.6kW SolarEdge system with Trina 440w panels recently completed in Beecroft. This system included two arrays across two roofs, with 15 degree tilt frames on the 5 degree south sloping roof over the deck, to give a 10 degree North facing tilt. This helps increase the solar irradiance onto the panels and increasing over energy produced, especially during the winter months when the sun is lower in the sky.

This setup, coupled with SolarEdge power optimisers ensures maximum efficiency given the constraints of the site.

#

6.1kW  micro inverter array installed with 15 degree tilt frames to maximise the North aspect garage roof. Although only...
25/02/2024

6.1kW micro inverter array installed with 15 degree tilt frames to maximise the North aspect garage roof.
Although only 14 panels, this system is generating on average of 25kWh of energy, and up to 40kWh on a perfect sunny day ☀️☀️

Along with the solar system, we completed and meter panel and switchboard upgrade with RCD safety switch protection. We also completed a three phase metering upgrade and installed a three phase supply to the garage for the workshop equipment.

18/09/2023
18/09/2023
NEW CONNECTIONS ⚡️⏰Six new single phase connections and metering for . We can coordinate and setup your new NMI and reta...
24/07/2023

NEW CONNECTIONS ⚡️⏰

Six new single phase connections and metering for . We can coordinate and setup your new NMI and retail account for you, taking the headache out of getting connected to the electricity network 👌🏼

Address

Bondi, NSW