11/06/2026
⚽🏆 With the FIFA World Cup kicking off tomorrow, it’s a timely reminder of the role well-designed playing surfaces play in supporting elite football.
In Tauranga, New Zealand, a heavily used community field had been struggling with poor drainage and frequent winter waterlogging, limiting year round use. To resolve this, a high performance drainage system was designed and installed using 2,400m of Megaflo Green socked slotted drain pipe and 4,800m² of Bidim Green non woven geotextile.
Installed beneath the upgraded sports surface, the new system now manages significant rainfall and supports long term field performance and usability throughout the year.
🔗Read the full case study: https://bit.ly/fifa-compliant-football-field