03/06/2026
This one was a challenge we loved.
Thornlands State School hall — a huge space that needed acoustic treatment tough enough to survive basketballs, accessible enough to install at height, and effective enough to actually transform how music sounds in there.
Working alongside and , the results exceeded testing expectations.
The feedback from the music teachers said it all. After nearly 10 years of conducting bands in the hall, they told us the difference was amazing — note articulation that was previously lost in reverb is now clear, and the improvement is even noticeable just speaking in the room.
Schools, halls, auditoriums — big acoustic problems are what we’re built for.
📩 DM us to talk about your space.