31/05/2026
On a BESS substation expansion, the workshop isn’t the finish line — the install is where everything has to land perfectly.
In this quick interview, Tony Whittred shares what he checks before the first lift, why DWW Engineering pre-assembles major substation steel at Darra, and how packing order + clear marking keeps the crew moving with confidence.
Read the full article: https://dww.com.au/interview-with-tony-whittred-on-site-installation-for-a-bess-substation-expansion/