09/09/2026
180 metres of cutting. Then we found a surprise underneath.
Prepped an entire backyard, the side of the house, and sections of the front footpath for a home extension at JG Building. Halfway through, we hit a second concrete slab hiding under the first.
Removed the top layer, grabbed the handsaw, and cut straight through the hidden one too. Site's fully prepped for the next stage.