Buangor STEEL Fabrication

Buangor STEEL Fabrication Trade Qualified for over 40 years

Repair and modifications general steel fabrication
No job to small or too big.
$30.00per hour +materials .
$40.00 per hour for onsite work depending on location
Got something that needs fixing or have a project in mind give me a call

The camper has returned from a outback tour to be modified again, sand and stones destroyed everything. A re engineered ...
02/08/2021

The camper has returned from a outback tour to be modified again, sand and stones destroyed everything.
A re engineered camper no boat mounts and a sealed box for the storage and a couple of extra items.

Another happy customer. Change the wheel bearing on the camper trailer,remove the gas cylinder mounts and reposition the...
23/05/2021

Another happy customer.
Change the wheel bearing on the camper trailer,remove the gas cylinder mounts and reposition them and hinge them so the cylinder can be removed easily.
Fit 2 new jerrycans holder and construct a lock for the water filler.

I’ve just completed another modification to the camper and boat.A drop down motor and spare wheel mount.
17/04/2021

I’ve just completed another modification to the camper and boat.
A drop down motor and spare wheel mount.

The finished product. A can dispenser
03/04/2021

The finished product. A can dispenser

Just waiting on one item to arrive and its finally finish the buggy. Can’t wait to see it actually running.
09/03/2021

Just waiting on one item to arrive and its finally finish the buggy. Can’t wait to see it actually running.

A Buggy update.The clutch is work and the new exhaust system had been modified and finished.
28/01/2021

A Buggy update.
The clutch is work and the new exhaust system had been modified and finished.

A few photos of the cat enclosure I’ve been working on in Ararat.
22/01/2021

A few photos of the cat enclosure I’ve been working on in Ararat.

I’ve done some more work on the Buggy the new rear shocker and new mounts are done.
22/01/2021

I’ve done some more work on the Buggy the new rear shocker and new mounts are done.

The current project I’m working on. It had to be widened,lengthened and shortened in hight.
18/01/2021

The current project I’m working on. It had to be widened,lengthened and shortened in hight.

Part two of a fire wood cutting unit.
02/01/2021

Part two of a fire wood cutting unit.

Having the motor in position was just the beginning.A chain tensioner had to be constructed. Not an easy task but I got ...
29/11/2020

Having the motor in position was just the beginning.
A chain tensioner had to be constructed. Not an easy task but I got there. Still to go is clutch and gear shift cables and the accelerator cable. All the electrical has to be done and then create a new exhaust system for it.

My latest acquisition .  My new work horse.It’s need a power steering pump. ORDERED.Front brake rotors and pads. ORDERED...
20/11/2020

My latest acquisition . My new work horse.
It’s need a power steering pump. ORDERED.
Front brake rotors and pads. ORDERED
Awaiting confirmation on the right gear selector cable and the it too will be Ordered.Now ordered
Get it all decayed up and the old gal will look good.

Address

15 Gravel Route Road
Buangor, VIC
3375

Telephone

+61492145591

Website

Alerts

Be the first to know and let us send you an email when Buangor STEEL Fabrication posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share