Sunraysia Land Clearing & Contracting

Sunraysia Land Clearing & Contracting Caterpillar IT14G loader with attatchments:
4 in 1 bucket
Log grab
Jib & wine bin lifting frame
Forks
Clearing, Post pulling, Earthmoving

Spent the morning helping the Mildura Motorcycle Club shift one of the grandstands out of the speedway complex over to t...
19/04/2019

Spent the morning helping the Mildura Motorcycle Club shift one of the grandstands out of the speedway complex over to the arenaX.. Its on this Saturday night track looks mint should be a good event!!

Last night we were trying to make the most of our time heaping and buring some citrus trees but it ended up taking longe...
22/01/2019

Last night we were trying to make the most of our time heaping and buring some citrus trees but it ended up taking longer.. Just had to wait a day for the ground to dry out and we were away again.

VICTORIAN property's any burn offs that you were going to do this year get to it. You only have this week to do so!https...
10/10/2018

VICTORIAN property's any burn offs that you were going to do this year get to it. You only have this week to do so!

https://m.facebook.com/story.php?story_fbid=907030096157560&id=241455676048342

πŸš’πŸš’πŸš’ IMPORTANT NOTICE πŸš’πŸš’πŸš’

The Fire Danger Period (FDP) for District 18 has been declared and will commence at 0100hrs on Monday 15th October, 2018

If you reside within the Midlura, Swan Hill, Buloke and the norther part of Yarriambiack municipalities, this applies to you.

For information relating to restrictions throughout the FDP or on days of Total Fire Ban - please consult CFA's 'Can I or Can't I?' document - http://www.cfa.vic.gov.au/warnings-restrictions/can/

For information on permits for burn offs or other local restrictions, consult your council or contact our office.

Remember - always register your burn off by calling 1800 668 511.

Attached below is the vegetation curing map clearly showing how dry the Sunraysia area is and it’s surrounds.

Stay safe this summer. πŸš’πŸ‘¨πŸ»β€πŸš’πŸ‘¨πŸ½β€πŸš’πŸ‘©πŸ»β€πŸš’

Usually we have requests to build a MX track but this one was to tear it down. 2 jumps and 1 corner is all thats left of...
06/09/2018

Usually we have requests to build a MX track but this one was to tear it down. 2 jumps and 1 corner is all thats left of a 10 acre track. With 13 berms, 5 large table tops and a set of doubles it would have been the ultimate playground.
Soon to be an extension on one of the local almond farms. πŸšœπŸ›΅πŸ

Some exciting changes happening at The D'Vine Shed same theme but a fresh "revamp" there is a special fathers day being ...
18/08/2018

Some exciting changes happening at The D'Vine Shed same theme but a fresh "revamp" there is a special fathers day being held at the venue. Head over to there page and check out the details!

This job was 40acres completed in May. As you can see from the before and after pics there had already been a few "attem...
07/08/2018

This job was 40acres completed in May. As you can see from the before and after pics there had already been a few "attempts" at cleanning it up. Our part was to clean up and prep the ground for the new vineyard including ripping and rotoryhoe. Over the next few months the property owners have been busy getting posts in and preparing for the young vines.

25ac paddock ripped over the weekend. Run the rotory hoe over it tomorrow and it will be ready for the young citrus tree...
01/07/2018

25ac paddock ripped over the weekend. Run the rotory hoe over it tomorrow and it will be ready for the young citrus trees.

Cleaning up stumps from an old wind break row.
27/05/2018

Cleaning up stumps from an old wind break row.

We found the time today to build a loading ramp so a farmer can bring his big toys into town.
08/05/2018

We found the time today to build a loading ramp so a farmer can bring his big toys into town.

A job we completed in Nangiloc from cutting the trellis right through to tranporting the old wire to be recycled. Tim on...
20/09/2017

A job we completed in Nangiloc from cutting the trellis right through to tranporting the old wire to be recycled. Tim on the bobcat pulling posts and vines.. Also while we were there we removed and heaped 4 acres of citrus, cleaned up 2 old house sites and some old concrete that was at the end of citrus rows and in the way for the tractors to turn.

20 acre block being re developed after the water had been turned off 15 years ago. The ground sure did get the ripper ty...
23/08/2017

20 acre block being re developed after the water had been turned off 15 years ago. The ground sure did get the ripper tynes shined up! The soil hasnt been worked for over 30 years. Also found some old main line the new owners didnt know existed! πŸ‡πŸšœ

Address

Buronga, NSW
2739

Website

Alerts

Be the first to know and let us send you an email when Sunraysia Land Clearing & Contracting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category