26/04/2026
A solid week last week installing 2 x Taylex poly systems, one in Forcett and another in Cremorne.
Both had their challenges!
Forcett job we had to bypass the old septic that was conveniently located under the deck, remove the old grease trap and run new drains, then we hit stone and were tapping away on the breaker all afternoon.
At Cremorne we removed a failed Biolytix system which we discovered had been concreted in, so we had to dig a new hole uphill from the old one.
350m2 new irrigation also installed at Cremorne.
Great work again by Robinsons Gravel and Excavations, All Pumping Solutions and Latham Electrical for getting these ones done with minimal inconvenience to the homeowners