Asmbl Joinery Canberra - Custom Kitchens and Wardrobes

Asmbl Joinery Canberra - Custom Kitchens and Wardrobes Asmbl Joinery—Canberra's experts in bespoke kitchens, wardrobes, and custom joinery. Contact us today for your renovation needs!

Transform your space with exceptional craftsmanship and personalised design.

25/08/2026

Every panel goes through three completely different stations before it's ready to assemble. First the CNC bores every connector hole and cuts the groove that lets everything sit flush. Then it's through the edge ba**er for a finished edge. Last step — the connector gets hammered straight into place.

Asmbl — custom joinery, Canberra.

24/08/2026

For years we ran off a bench built from scraps and offcuts lying around the shop. It did the job. The new one has a solid steel frame, an MDF top, and wheels underneath so it moves wherever it's needed — built for making more cabinets than ever.

Asmbl — custom joinery, Canberra.

23/08/2026

Every cabinet gets taped, wrapped and packed individually before it leaves the workshop — hanging rails protected so nothing scratches, shelves wrapped separately, everything covered for the drive. That's why it still looks perfect when it lands at your door.

Asmbl — custom joinery, Canberra.

21/08/2026

Long hanging rails don't just need end supports — without something in the middle, they'll sag under the weight over time. This bracket ties straight into the ceiling to keep the whole run dead straight, no matter how much is hanging off it.

Asmbl — custom joinery, Canberra.

20/08/2026

Every Cabineo pocket gets three specially bored 15mm holes, plus one precisely drilled 5mm hole for alignment — and it has to come out identical on every single panel. Here's how we get that kind of consistency on every build.

Asmbl — custom joinery, Canberra.

13/08/2026

Turn the sound on for this one. 🔊

A minute inside our Mitchell workshop on a productive day — the CNC cutting, the edgeba**er running, connectors tapping in, drawers gliding closed. No music needed; the shop has its own soundtrack.

Asmbl — custom joinery, fitout and construction, Canberra.

11/08/2026

Stop using screws for your drawer boxes. Use these instead.

Lamello Cabineo — the pocket gets machined on the CNC, the connector taps straight in, screws in from inside the joint, and the whole box locks up square with nothing showing on the outside. No caps, no plugs, no visible fixings on the finished piece.

Slower to machine than running confirmats? Yep. Worth it? Every single time — the joint's stronger, it's square off the machine, and on high-end work you're paying for clean surfaces, so that's what we build.

This is what goes into every drawer and tray that leaves our workshop.

Fight me in the comments if you're still team screws. 🔩

Asmbl — custom joinery, Canberra.

07/08/2026

A quick run-through of the Cabineo connectors we use when building our Blum Australia Pty Ltd Movento drawers and trays.

The pockets come straight off the CNC, the fitting sits fully inside the joint, and everything locks together internally — no screws, no caps, no visible fixings anywhere on the finished piece. Just clean, uninterrupted surfaces.

It's a system we lean on for the special trays in our high-end wardrobe builds, where every visible detail matters. Machine it right and the finish speaks for itself.

Asmbl — custom joinery, fitout and construction, Canberra.

03/08/2026

Some custom vanities and bathroom joinery coming together in the workshop right now, and they're looking sharp.

polytec Plantation Ash exterior, black carcasses with black Blum Legrabox drawers — full blackout inside — plus integrated LED lighting. It's the details you only see when you open the drawer that separate custom joinery from flat-pack, and this combo is one of our favourites we've done.

These are headed for install soon. More to come.

Asmbl — custom joinery, fitout and construction, Canberra.

Higgins Project.A front-on view showcasing Prime Oak by  ,  Cleantouch Ultra Matt, and beautifully crafted curved island...
04/12/2025

Higgins Project.
A front-on view showcasing Prime Oak by , Cleantouch Ultra Matt, and beautifully crafted curved island ends in a matching 2-pac satin finish using half-round panels.
Soft, sculptural, and perfectly balanced.

Address

36 Hoskins Street, Mitchell
Canberra, ACT
2911

Alerts

Be the first to know and let us send you an email when Asmbl Joinery Canberra - Custom Kitchens and Wardrobes posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share