Rammed Earth Victoria

Rammed Earth Victoria Rammed Earth Victoria is based in Crib Point on the Mornington Peninsula catering to all who want to

Rammed Earth Victoria build beautiful rammed earth walls and rammed earth structures for accommodation resorts, wineries, schools, public buildings and modern family homes. We build to any budget and any style throughout victoria and beyond.

BIG.BOLD.UNAPOLOGETIC.Leaning lines.Towering form.Solid earth.This fireplace wasn't designed to blend in......Epic ramme...
08/05/2026

BIG.
BOLD.
UNAPOLOGETIC.

Leaning lines.
Towering form.
Solid earth.

This fireplace wasn't designed to blend in......

Epic rammed earth by Rammed Earth Victoria.

27/03/2026

This Is Why Architects Specify Rammed Earth”

It’s not just about how it looks — it’s about performance.

✔ Thermal mass that stabilises internal temperatures
✔ Acoustic performance for quieter living
✔ Fire resistance built into the structure
✔ Natural, low-maintenance finish that ages beautifully

Rammed earth isn’t a trend. It’s a long-term building solution.

And when it’s done right — it becomes the hero of the home.

We’re seeing more architects across Victoria choosing rammed earth not just for sustainability… but for certainty in performance and timeless design.

If you’re designing or planning a build and want something that stands apart — this is it.

📩 Send us a message to discuss your project

12/03/2026

We’re looking for skilled labourers to join our team building some of Victoria’s most unique architectural homes.

If you enjoy working outdoors, take pride in quality construction, and want to learn a specialist building craft, this could be the job for you.
You’ll be working with a small professional crew constructing rammed earth walls on projects across Melbourne and regional Victoria.

What the role involves:
• Rammed earth wall construction
• Formwork setup
• Use of hand and power tools
• Working with a tight crew on high-end builds

Experience in construction, carpentry, formwork or machine operation is highly regarded but not essential. All training can be provided.

What we offer:
• Work on architect-designed projects
• Learn a specialist sustainable building trade
• Supportive crew and great working environment
• $35+ per hour depending on experience + Super

To apply or learn more:
Call Matt on 0412 927 110
Or send us a message

Call now to connect with business.

We are hiring!!! Tell all your friends.  Start asap.
02/03/2026

We are hiring!!! Tell all your friends. Start asap.

19/02/2026

Full throttle. No excuses. No half measures.
When we commit to a project, we go all in — from the first formwork to the final compacted layer. Precision, pace, and pride in every detail.
Getting the job done isn’t about rushing. It’s about momentum. It’s about showing up every day with the same intensity and finishing stronger than we started.
That’s how solid work is built.

Imagine living in a home where the walls become a canvas for nature.
19/02/2026

Imagine living in a home where the walls become a canvas for nature.

17/02/2026

🚜 FOR SALE – MANITOU TELEHANDLER

************$70,000 + gst*****************

MLT-X 732-95 premium | 2017 | ~900 hours
Reliable, well maintained and ready for work.
Perfect for construction, farms or materials handling.
Comes with a 1 cubic mtr bucket & forks.

📍 Located in Australia
📩 DM or call 0412 927 110 for inspection

We’re nearing the end of another custom rammed earth build in beautiful Barwon Heads — and this one is something special...
15/02/2026

We’re nearing the end of another custom rammed earth build in beautiful Barwon Heads — and this one is something special.
There’s a moment at the end of every project where the forms come off, the walls are revealed, and you see the raw stratification of the earth in full expression. No cladding. No cover-ups. Just material honesty.
Rammed earth isn’t just a finish — it’s thermal mass, acoustic performance, fire resistance, and longevity engineered into the structure itself.
Built for:
✔️ Coastal conditions
✔️ Passive performance
✔️ Architectural integrity
✔️ Generational durability
In a location like Barwon Heads, resilience matters. Salt air. Wind exposure. Temperature variation. This build delivers performance without compromising design.
Mass. Texture. Permanence.
This is sustainable construction done properly.
If you’re designing or building a high-performance home and want materials that work as hard as they look — let’s talk.
EcoLuxury ArchitecturalBuild ThermalMass BuiltToLast

27/01/2026

Address

3 Milne Point
Crib Point, VIC
3919

Opening Hours

Monday 7am - 6pm
Tuesday 7am - 6pm
Wednesday 7am - 6pm
Thursday 7am - 6pm
Friday 7am - 6pm
Saturday 7am - 6pm

Alerts

Be the first to know and let us send you an email when Rammed Earth Victoria posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Rammed Earth Victoria:

Share

Category