Condamine Electric Company

Condamine Electric Company Based in Dalby servicing the industrial, domestic & agricultural industries. Specialising in switchboard manufacturing, installation & maintenance.

Glorious scenes from the boys this morning. Straight to the pool room. There has to be a perk to the early starts!
11/05/2026

Glorious scenes from the boys this morning. Straight to the pool room. There has to be a perk to the early starts!

05/05/2026

Just a quick update that our business phones are currently down. In the meantime, please contact 0467649752 for anything urgent.

⚡️⚡️We are back!!⚡️⚡️Sorry for our short absence from social media but we have returned and you can bet that we’ve been ...
01/05/2026

⚡️⚡️We are back!!⚡️⚡️
Sorry for our short absence from social media but we have returned and you can bet that we’ve been busy.

The boys have been out at the where cutting edge technology and design is being used to produce a fertiliser that’s a first of its kind. After many months of planning, engineering, design, construction and installation we are happy to say that it’s now complete!!

With a new set of mains supply cables and a new 3200 Amp main switch, this plant can pack a very hefty punch, along side multiple new control cabinets all on display in a new switch room.

As always, thanks to ENAP and their great crew of boys for smashing out the mechanical install and being a breeze to work with!!

09/04/2026

They’re just jerseys on a line now…

But this Teen Boys & Colts season, they carried our boys through hard runs, tough lessons and plenty of growth.

Win, lose or draw — our boys showed up.

And none of it happens without the business on these jerseys backing them every step of the way.

A huge thank you to our 2026 sponsor — you’re part of every game, every effort, every moment.

Please support those who support our club.

Condamine Electric Company

**ELECTRICAL TECHNICIAN POSITION** All details in the post below ⬇️
18/03/2026

**ELECTRICAL TECHNICIAN POSITION**

All details in the post below ⬇️

We recently sent Jimmy to Timor to help  Power Up Project install solar in Holpilat and rewire a clinic in Gala. A great...
03/11/2025

We recently sent Jimmy to Timor to help Power Up Project install solar in Holpilat and rewire a clinic in Gala. A great experience soaking up the local culture & making unforgettable memories!

⚡️A week with Connor⚡️Let’s join Connor for an exciting week of fault finding, board building and install work.Started o...
05/08/2025

⚡️A week with Connor⚡️

Let’s join Connor for an exciting week of fault finding, board building and install work.

Started off the week in the shed, working on a control board for developmental feeding system for a feedlot.
From there, went to finish off a tidy job done by Will and George out at Chinchilla, which consisted of a Main Switchboard & distribution board replacement and upgrade.
Then, with the masterful Guma, went to Jandowae to work on developing an automated solar powered cattle drafting system for Morrissey Cattle Co.
Followed this up with a little bit of switchboard design back in the office.
Ended the week at the Cecil Plains cotton gin, doing some fault finding to get production up and running again

All in all, an exciting, busy and productive week.

EDIT: A huge thank you to everyone who applied for our 2026 apprentice positions! We’ve had an overwhelming response thi...
04/08/2025

EDIT: A huge thank you to everyone who applied for our 2026 apprentice positions! We’ve had an overwhelming response this year and appreciate the time and effort everyone has put into their applications. All applicants will be contacted shortly via email or phone regarding the outcome of their application and to arrange interview for shortlisted candidates.
Thanks!

Applications are now open for a 2026 apprenticeship. We welcome interest from enthusiastic and motivated school leavers and mature aged applicants.

⚡️ A day with Declan ⚡️We recently wrapped up a tidy install for RSA Contractors, wiring up their new mobile batch plant...
26/06/2025

⚡️ A day with Declan ⚡️

We recently wrapped up a tidy install for RSA Contractors, wiring up their new mobile batch plant — fully powered by a large onsite generator. The job included running cable tray and wiring out to all the key components: pumps, conveyor motor, load cells, power outlets, lights, and solenoids.

Connor was responsible for the board design and wiring, getting everything ready for deployment. Once the board was complete, George and Declan headed out to site to kick off the installation.

Control was handled via a custom switchboard housed in a container, which we also fitted out with power, lighting, and air conditioning.

One of the main challenges on this one was making sure the entire plant could be relocated between sites. We also had to ensure the cabling was tough and well-protected, given the rocky, heavy-duty conditions the plant operates in.

We’re stoked with the end product — a durable setup ready to handle serious work out in the field!

13/06/2025

Address

Dalby, QLD
4405

Opening Hours

Monday 7:30am - 5pm
Tuesday 7:30am - 5pm
Wednesday 7:30am - 5pm
Thursday 7:30am - 5pm
Friday 7:30am - 5pm

Telephone

+61746623435

Alerts

Be the first to know and let us send you an email when Condamine Electric Company posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Condamine Electric Company:

Share

Category