20/08/2026
๐ง A LITTLE DIFFERENT FROM THE EVERYDAY!
Itโs always good to mix things up a little, and this install definitely gave the team a different perspective! ๐
We recently completed a 2 x 3.5kW Daikin split system changeover, with one small catch โ they were being installed on the 3rd floor! ๐ข
That meant a little elevation was required, but the Coolit NT team got it done and the new systems are in and ready to keep things comfortable. ๐จโ๏ธ
Another job done, another challenge ticked off!
๐ Need a new air conditioner or a system changeover? Get in touch with Coolit NT.