This job was definitely a process and for a small
Area was a bigger job. First we went to site and put a camera down the drain due to the drainage plan being wrong. From there we
- removed tiles
- cut and jackhammered the concrete.
- Removed the wall sheeting to add a new water point for the new toilet, move the washing machine taps to under the bench and added points for a new wall vanity.
- Added a waste point for the new vanity and re connected the washing machine.
- had the tiles re installed and grouted.
- installed the new toilet, existing toilet and new vanity.
Everything was then tested and a new drainage plan done ✅.