24/10/2026
What a wild week! 💪🔥
Feeling incredibly fortunate to have such a talented crew pushing through the challenges and delivering outstanding results on this project. The teamwork, problem-solving and attention to detail have been second to none.
This one has certainly kept us on our toes! The existing floor was out by 30mm, while the ceiling was out of level by 20mm in the opposite direction. Each unit also requires a 10mm perimeter gap around the timber reveals to allow for insulation foam.
To add another layer of complexity, the original timber windows were picking up part of the roof load. Aluminium windows and doors aren’t designed to carry structural loads, so getting this right required careful set-out, weeks of planning and plenty of collaboration.
Working closely with the homeowners, refining the design and details, and coordinating the right materials and supplies, we’ve developed a solution that brings everything together. The end result is going to be nothing short of spectacular! 👌
A massive thank you to our incredible clients for their trust, patience and collaboration throughout every stage of the process. It’s a pleasure working with people who are so involved, supportive and passionate about the end result.
And the hospitality has been next level! Fresh homemade chocolate chip cookies, scones with jam and whipped cream, muffins, cold drinks every day — and even KFC snack packs for the lads! 😂🙏 It’s the little things that make a big difference, and we genuinely appreciate it all.
Big challenges, great teamwork and amazing clients. This is what it’s all about!
We’re excited to keep bringing this project to life and can’t wait to share the finished results.
👉 Like, share and follow along to see the transformation!
Appreciate everyone involved. Exciting times ahead! 🤙